Details

Reactor Type Pressurised Water Reactor (or PWR)
Model PWR 3 loops
Owner Iberdrola, Gas Natural, Hidroeléctrica Del Cantábrico, Nuclenor
Operator Centrales Nucleares Almaraz-Trillo (Id/Ufg/Endesa/Hc/Nuclenor)

Timeline

Construction Start Friday, 17 August 1979
First Criticality Saturday, 14 May 1988
First Grid Connection Monday, 23 May 1988
Commercial Operation Saturday, 6 August 1988

Specifications

Capacity Net 1003 MWe
Capacity Gross 1066 MWe
Thermal Capacity 3010 MWt
Design Net Capacity 990 MWe

Operational History

Electricity Supplied (GWh)

Energy Availability Factor (%)

Total Electricity Supplied (GWh)

Reactor History

Year Reference Unit Power (MWe) Annual Time Online (Hours) Electricity Supplied (GWh) Operation Factor (%) Energy Availability Annual (%) Energy Availability Cumulative (%) Load Factor Annual (%) Load Factor Cumulative (%)
1988 990 3511 2896.23 72.10 72.70 72.70 66.30 66.30
1989 974 7665 7147.79 87.50 83.80 80.40 83.80 78.50
1990 974 7170 6372.44 81.80 74.70 78.10 74.70 77.00
1991 974 6891 6481.54 78.70 76.00 77.50 76.00 76.70
1992 1000 8028 7938.46 91.40 90.40 80.40 90.40 79.80
1993 1000 7512 7395.86 85.80 84.40 81.20 84.40 80.70
1994 1000 8009 7927.69 91.40 91.00 82.70 90.50 82.20
1995 1000 7597 7472.62 86.70 85.80 83.20 85.30 82.60
1996 1000 7713 7626.31 87.80 87.30 83.60 86.80 83.20
1997 1000 8066 7765.45 92.10 89.30 84.30 88.60 83.70
1998 1000 6686 6589.73 76.30 75.80 83.40 75.20 82.90
1999 1000 6876 6828.82 78.50 78.00 83.00 78.00 82.50
2000 1000 8251 8206.49 93.90 93.60 83.80 93.40 83.40
2001 1000 7966 7907.41 90.90 90.60 84.30 90.30 83.90
2002 1000 7876 7827.00 89.90 89.60 84.70 89.30 84.30
2003 1003 8210 8114.66 93.70 93.10 85.20 92.50 84.80
2004 1003 8121 7980.12 92.40 91.50 85.60 90.60 85.20
2005 1003 8175 8080.62 93.30 92.90 86.10 92.00 85.60
2006 1003 7788 7687.80 88.90 88.40 86.20 87.50 85.70
2007 1003 8039 7948.88 91.80 91.40 86.50 90.50 85.90
2008 1003 7820 7743.95 89.00 88.50 86.60 87.90 86.00
2009 1003 7438 7197.10 84.90 82.40 86.40 81.90 85.80
2010 1003 7969 7695.50 91.00 87.80 86.40 87.60 85.90
2011 1003 7940 7835.70 90.60 89.10 86.60 89.20 86.00
2012 1003 8066 7948.78 91.80 90.30 86.70 90.20 86.20
2013 1003 7656 7487.11 87.40 85.40 86.60 85.20 86.20
2014 1003 7901 7785.49 90.20 88.60 86.70 88.60 86.30
2015 1003 8009 7926.99 91.40 90.20 86.90 90.20 86.40
2016 1003 8111 8004.55 92.30 91.40 87.00 90.80 86.60
2017 1003 8067 7983.09 92.10 90.90 87.20 90.90 86.70
2018 1003 7841 7732.00 89.50 88.10 87.20 88.00 86.80
2019 1003 8049 7905.28 91.90 90.20 87.30 90.00 86.80
2020 1003 7981 7729.61 90.90 89.10 87.30 87.70 86.90
2021 1003 7571 7408.21 86.40 84.60 87.20 84.30 86.80
2022 1003 7849 7679.74 89.60 87.40 87.30 87.40 86.80

Source: Operating details - IAEA PRIS