Details
| Reactor Type | Pressurized Water Reactor (or PWR) |
|---|---|
| Model | VVER V-428M |
| Owner | Jiangsu Nuclear Power Corporation |
| Operator | Jiangsu Nuclear Power Corporation |
Timeline
| Construction Start | Thursday, 27 December 2012 |
|---|---|
| First Criticality | Friday, 29 September 2017 |
| First Grid Connection | Saturday, 30 December 2017 |
| Commercial Operation | Wednesday, 14 February 2018 |
Specifications
| Capacity Net | 1060 MWe |
|---|---|
| Capacity Gross | 1126 MWe |
| Thermal Capacity | 3000 MWt |
| Design Net Capacity | 1060 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
| Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
|---|---|---|---|---|---|---|---|---|
| 2017 | 1060 | 30 | 1.84 | - | - | - | - | - |
| 2018 | 1045 | 7704 | 6922.47 | 86.80 | 90.80 | 90.80 | 78.80 | 78.80 |
| 2019 | 1045 | 7055 | 7149.36 | 80.50 | 81.20 | 85.80 | 78.10 | 78.40 |
| 2020 | 1045 | 7611 | 6896.21 | 86.60 | 90.70 | 87.50 | 75.10 | 77.30 |
| 2021 | 1060 | 7790 | 7919.12 | 88.90 | 92.30 | 88.70 | 85.30 | 79.40 |
| 2022 | 1060 | 8709 | 8757.42 | 99.40 | 98.90 | 90.80 | 94.30 | 82.40 |
| 2023 | 1060 | 6922 | 7013.26 | 79.00 | 78.10 | 88.60 | 75.50 | 81.30 |
| 2024 | 1060 | 7935 | 7865.12 | 90.30 | 88.20 | 88.60 | 84.50 | 81.70 |