Details

Reactor Type Pressurised Water Reactor (or PWR)
Model VVER V-428M
Owner Jiangsu Nuclear Power Corporation
Operator Jiangsu Nuclear Power Corporation

Timeline

Construction Start Thursday, 27 December 2012
First Criticality Friday, 29 September 2017
First Grid Connection Saturday, 30 December 2017
Commercial Operation Wednesday, 14 February 2018

Specifications

Capacity Net 1060 MWe
Capacity Gross 1126 MWe
Thermal Capacity 3000 MWt
Design Net Capacity 1060 MWe

Operational History

Electricity Supplied (GWh)

Energy Availability Factor (%)

Total Electricity Supplied (GWh)

Reactor History

Year Reference Unit Power (MWe) Annual Time Online (Hours) Electricity Supplied (GWh) Operation Factor (%) Energy Availability Annual (%) Energy Availability Cumulative (%) Load Factor Annual (%) Load Factor Cumulative (%)
2017 1060 30 1.84 - - - - -
2018 1045 7704 6922.47 86.80 90.80 90.80 78.80 78.80
2019 1045 7055 7149.36 80.50 81.20 85.80 78.10 78.40
2020 1045 7611 6896.21 86.60 90.70 87.50 75.10 77.30
2021 1060 7790 7919.12 88.90 92.30 88.70 85.30 79.40
2022 1060 8709 8757.42 99.40 98.90 90.80 94.30 82.40
2023 1060 6922 7013.26 79.00 78.10 88.60 75.50 81.30

Source: Operating details - IAEA PRIS