Details
| Reactor Type | Pressurized Water Reactor (or PWR) |
|---|---|
| Model | ACPR-1000 |
| Owner | Jiangsu Nuclear Power Corporation |
| Operator | Jiangsu Nuclear Power Corporation |
Timeline
| Construction Start | Sunday, 27 December 2015 |
|---|---|
| First Criticality | Monday, 27 July 2020 |
| First Grid Connection | Saturday, 8 August 2020 |
| Commercial Operation | Tuesday, 8 September 2020 |
Specifications
| Capacity Net | 1060 MWe |
|---|---|
| Capacity Gross | 1118 MWe |
| Thermal Capacity | 2905 MWt |
| Design Net Capacity | 1000 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
| Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
|---|---|---|---|---|---|---|---|---|
| 2020 | 1000 | 3383 | 2901.91 | 95.90 | 93.30 | 93.30 | 91.30 | 91.30 |
| 2021 | 1060 | 7400 | 7538.34 | 84.50 | 84.40 | 86.50 | 81.20 | 83.60 |
| 2022 | 1060 | 8760 | 8933.22 | 100.00 | 98.40 | 91.60 | 96.20 | 89.00 |
| 2023 | 1060 | 7864 | 8038.07 | 89.80 | 91.50 | 91.60 | 86.60 | 88.30 |
| 2024 | 1060 | 8258 | 8562.19 | 94.00 | 92.30 | 91.80 | 92.00 | 89.20 |