Construction start estimated from satellite data showing construction underway. Official first concrete is to be confirmed.

Capacities are estimates.

Details

Reactor Type High Temperature Gas-Cooled Reactor (or HTGR)
Model HTR-PM600
Owner CNNC
Operator CNNC

Timeline

Construction Start Monday, 10 June 2024

Specifications

Capacity Net 600 MWe
Capacity Gross 650 MWe
Thermal Capacity 1500 MWt
Design Net Capacity 600 MWe

Operational History

Electricity Supplied (GWh)

Energy Availability Factor (%)

Total Electricity Supplied (GWh)

Reactor History

Year Reference Unit Power (MWe) Annual Time Online (Hours) Electricity Supplied (GWh) Operation Factor (%) Energy Availability Annual (%) Energy Availability Cumulative (%) Load Factor Annual (%) Load Factor Cumulative (%)