Construction start estimated from satellite data showing construction underway. Official first concrete is to be confirmed.
Capacities are estimates.
Details
| Reactor Type | High Temperature Gas-Cooled Reactor (or HTGR) |
|---|---|
| Model | HTR-PM600 |
| Owner | CNNC |
| Operator | CNNC |
Timeline
| Construction Start | Monday, 9 December 2024 |
|---|
Specifications
| Capacity Net | 600 MWe |
|---|---|
| Capacity Gross | 650 MWe |
| Thermal Capacity | 1500 MWt |
| Design Net Capacity | 600 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
| Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
|---|