Details
Reactor Type | Pressurised Water Reactor (or PWR) |
---|---|
Model | VVER V-491 |
Owner | China National Nuclear Corporation |
Operator | Liaoning Nuclear Power Company, Lmt. |
Timeline
Construction Start | Thursday, 19 May 2022 |
---|
Specifications
Capacity Net | 1200 MWe |
---|---|
Capacity Gross | 1274 MWe |
Thermal Capacity | 3200 MWt |
Design Net Capacity | 1200 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
---|