Details
| Reactor Type | Pressurized Water Reactor (or PWR) |
|---|---|
| Model | CPR-1000 |
| Owner | Yangjiang Nuclear Power Company |
| Operator | Yangjiang Nuclear Power Company |
Timeline
| Construction Start | Tuesday, 16 December 2008 |
|---|---|
| First Criticality | Monday, 23 December 2013 |
| First Grid Connection | Tuesday, 31 December 2013 |
| Commercial Operation | Tuesday, 25 March 2014 |
Specifications
| Capacity Net | 1000 MWe |
|---|---|
| Capacity Gross | 1086 MWe |
| Thermal Capacity | 2905 MWt |
| Design Net Capacity | 1021 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
| Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
|---|---|---|---|---|---|---|---|---|
| 2013 | 1000 | 5 | 0.00 | - | - | - | - | - |
| 2014 | 1000 | 6753 | 6793.37 | 100.00 | 99.90 | 99.90 | 100.50 | 100.50 |
| 2015 | 1000 | 7021 | 7025.37 | 80.20 | 79.70 | 88.40 | 80.20 | 88.90 |
| 2016 | 1000 | 6989 | 7077.81 | 79.60 | 81.50 | 85.90 | 80.60 | 85.90 |
| 2017 | 1000 | 8677 | 8699.83 | 99.00 | 99.80 | 89.60 | 99.30 | 89.50 |
| 2018 | 1000 | 7789 | 7715.76 | 88.90 | 88.20 | 89.30 | 88.10 | 89.20 |
| 2019 | 1000 | 7861 | 7988.46 | 89.70 | 89.10 | 89.30 | 91.20 | 89.50 |
| 2020 | 1000 | 8665 | 8122.92 | 98.60 | 98.40 | 90.60 | 92.50 | 90.00 |
| 2021 | 1000 | 7834 | 7930.66 | 89.40 | 88.70 | 90.40 | 90.50 | 90.00 |
| 2022 | 1000 | 8312 | 8373.86 | 94.90 | 94.20 | 90.80 | 95.60 | 90.70 |
| 2023 | 1000 | 8731 | 8868.11 | 99.70 | 99.60 | 91.70 | 101.20 | 91.80 |
| 2024 | 1000 | 7704 | 7803.91 | 87.70 | 87.30 | 91.30 | 88.80 | 91.50 |