Details
| Reactor Type | Pressurized Water Reactor (or PWR) |
|---|---|
| Model | CPR-1000 |
| Owner | Yangjiang Nuclear Power Company |
| Operator | Yangjiang Nuclear Power Company |
Timeline
| Construction Start | Thursday, 4 June 2009 |
|---|---|
| First Criticality | Monday, 2 March 2015 |
| First Grid Connection | Tuesday, 10 March 2015 |
| Commercial Operation | Friday, 5 June 2015 |
Specifications
| Capacity Net | 1000 MWe |
|---|---|
| Capacity Gross | 1086 MWe |
| Thermal Capacity | 2905 MWt |
| Design Net Capacity | 1000 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
| Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
|---|---|---|---|---|---|---|---|---|
| 2015 | 1000 | 6017 | 5683.72 | 100.00 | 99.80 | 99.80 | 102.20 | 102.20 |
| 2016 | 1000 | 6874 | 6911.71 | 78.30 | 77.60 | 85.80 | 78.70 | 87.40 |
| 2017 | 1000 | 7476 | 7497.38 | 85.30 | 88.00 | 86.60 | 85.60 | 86.70 |
| 2018 | 1000 | 8760 | 8910.12 | 100.00 | 100.00 | 90.30 | 101.70 | 90.90 |
| 2019 | 1000 | 7943 | 7478.07 | 90.70 | 90.00 | 90.30 | 85.40 | 89.70 |
| 2020 | 1000 | 6854 | 6539.67 | 78.00 | 88.50 | 89.90 | 74.40 | 86.90 |
| 2021 | 1000 | 8760 | 8783.89 | 100.00 | 100.00 | 91.50 | 100.30 | 89.00 |
| 2022 | 1000 | 8077 | 8156.58 | 92.20 | 91.80 | 91.50 | 93.10 | 89.50 |
| 2023 | 1000 | 8225 | 8111.96 | 93.90 | 93.90 | 91.80 | 92.60 | 89.90 |
| 2024 | 1000 | 8784 | 8799.14 | 100.00 | 100.00 | 92.60 | 100.20 | 91.00 |