Details
| Reactor Type | Pressurized Water Reactor (or PWR) |
|---|---|
| Model | CPR-1000 |
| Owner | Yangjiang Nuclear Power Company |
| Operator | Yangjiang Nuclear Power Company |
Timeline
| Construction Start | Monday, 15 November 2010 |
|---|---|
| First Criticality | Sunday, 11 October 2015 |
| First Grid Connection | Sunday, 18 October 2015 |
| Commercial Operation | Friday, 1 January 2016 |
Specifications
| Capacity Net | 1000 MWe |
|---|---|
| Capacity Gross | 1086 MWe |
| Thermal Capacity | 2905 MWt |
| Design Net Capacity | 1000 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
| Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
|---|---|---|---|---|---|---|---|---|
| 2015 | 1000 | 890 | 478.68 | - | - | - | - | - |
| 2016 | 1000 | 7559 | 7593.85 | 86.00 | 91.10 | 91.10 | 86.40 | 86.40 |
| 2017 | 1000 | 7435 | 7396.07 | 84.90 | 86.10 | 88.60 | 84.40 | 85.40 |
| 2018 | 1000 | 8028 | 7926.66 | 91.60 | 91.10 | 89.40 | 90.50 | 87.10 |
| 2019 | 1000 | 8760 | 8621.67 | 100.00 | 100.00 | 92.10 | 98.40 | 89.90 |
| 2020 | 1000 | 7039 | 6600.21 | 80.10 | 86.80 | 91.00 | 75.10 | 87.00 |
| 2021 | 1000 | 7978 | 7804.98 | 91.10 | 93.40 | 91.40 | 89.10 | 87.30 |
| 2022 | 1000 | 8760 | 8991.99 | 100.00 | 100.00 | 92.60 | 102.60 | 89.50 |
| 2023 | 1000 | 8087 | 8071.11 | 92.30 | 91.90 | 92.60 | 92.10 | 89.80 |
| 2024 | 1000 | 8189 | 8156.23 | 93.20 | 92.80 | 92.60 | 92.80 | 90.20 |