Details
| Reactor Type | Pressurized Water Reactor (or PWR) |
|---|---|
| Model | CPR-1000 |
| Owner | Yangjiang Nuclear Power Company |
| Operator | Yangjiang Nuclear Power Company |
Timeline
| Construction Start | Saturday, 17 November 2012 |
|---|---|
| First Criticality | Friday, 30 December 2016 |
| First Grid Connection | Sunday, 8 January 2017 |
| Commercial Operation | Wednesday, 15 March 2017 |
Specifications
| Capacity Net | 1000 MWe |
|---|---|
| Capacity Gross | 1086 MWe |
| Thermal Capacity | 2905 MWt |
| Design Net Capacity | 1000 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
| Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
|---|---|---|---|---|---|---|---|---|
| 2017 | 1000 | 6353 | 6759.71 | 86.50 | 90.70 | 90.70 | 90.30 | 90.30 |
| 2018 | 1000 | 6695 | 6591.93 | 76.40 | 83.40 | 86.70 | 75.20 | 82.10 |
| 2019 | 1000 | 7164 | 6915.91 | 81.80 | 91.90 | 88.50 | 79.00 | 81.00 |
| 2020 | 1000 | 8216 | 7954.62 | 93.50 | 97.00 | 90.80 | 90.60 | 83.50 |
| 2021 | 1000 | 7880 | 7977.13 | 90.00 | 89.40 | 90.50 | 91.10 | 85.00 |
| 2022 | 1000 | 7927 | 7820.95 | 90.50 | 92.90 | 90.90 | 89.30 | 85.80 |
| 2023 | 1000 | 8760 | 8978.18 | 100.00 | 100.00 | 92.20 | 102.50 | 88.20 |
| 2024 | 1000 | 8083 | 8154.38 | 92.00 | 91.90 | 92.20 | 92.80 | 88.80 |