Details
| Reactor Type | Pressurized Water Reactor (or PWR) |
|---|---|
| Model | ACPR-1000 |
| Owner | Yangjiang Nuclear Power Company |
| Operator | Yangjiang Nuclear Power Company |
Timeline
| Construction Start | Monday, 23 December 2013 |
|---|---|
| First Criticality | Saturday, 22 June 2019 |
| First Grid Connection | Saturday, 29 June 2019 |
| Commercial Operation | Wednesday, 24 July 2019 |
Specifications
| Capacity Net | 1000 MWe |
|---|---|
| Capacity Gross | 1086 MWe |
| Thermal Capacity | 2905 MWt |
| Design Net Capacity | 1000 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
| Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
|---|---|---|---|---|---|---|---|---|
| 2019 | 1000 | 3915 | 3934.18 | 93.20 | 100.00 | 100.00 | 92.80 | 92.80 |
| 2020 | 1000 | 6526 | 5896.66 | 74.30 | 82.40 | 87.60 | 67.10 | 74.70 |
| 2021 | 1000 | 8571 | 8522.45 | 97.80 | 99.30 | 92.40 | 97.30 | 84.00 |
| 2022 | 1000 | 8234 | 8349.54 | 94.00 | 93.60 | 92.80 | 95.30 | 87.30 |
| 2023 | 1000 | 7990 | 8015.33 | 91.20 | 90.90 | 92.30 | 91.50 | 88.30 |
| 2024 | 1000 | 8110 | 8179.48 | 92.30 | 94.10 | 92.70 | 93.10 | 89.20 |