First criticality date estimated.
Details
Reactor Type | Pressurised Water Reactor (or PWR) |
---|---|
Model | Hualong One |
Owner | Cnnp Guodian Zhangzhou Energy Co.,Ltd |
Operator | Cnnp Guodian Zhangzhou Energy Co.,Ltd |
Timeline
Construction Start | Wednesday, 16 October 2019 |
---|---|
First Criticality | Wednesday, 20 November 2024 |
First Grid Connection | Thursday, 28 November 2024 |
Commercial Operation |
Specifications
Capacity Net | 1126 MWe |
---|---|
Capacity Gross | 1212 MWe |
Thermal Capacity | 3190 MWt |
Design Net Capacity | 1126 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
---|