Details
Reactor Type | Pressurised Water Reactor (or PWR) |
---|---|
Model | CAREM Prototype (Integrated-PWR) |
Owner | Comision Nacional De Energia Atomica |
Operator | Comision Nacional De Energia Atomica |
Timeline
Construction Start | Saturday, 8 February 2014 |
---|
Specifications
Capacity Net | 25 MWe |
---|---|
Capacity Gross | 29 MWe |
Thermal Capacity | 100 MWt |
Design Net Capacity | 25 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
---|