Details
Reactor Type | Pressurised Water Reactor (or PWR) |
---|---|
Model | Hualong One |
Owner | Guangxi Fangchenggang Nuclear Power Company, Ltd. |
Operator | Guangxi Fangchenggang Nuclear Power Company, Ltd. |
Timeline
Construction Start | Friday, 23 December 2016 |
---|---|
First Criticality | Wednesday, 3 April 2024 |
First Grid Connection | Tuesday, 9 April 2024 |
Commercial Operation | Saturday, 25 May 2024 |
Specifications
Capacity Net | 1105 MWe |
---|---|
Capacity Gross | 1188 MWe |
Thermal Capacity | 3150 MWt |
Design Net Capacity | 1105 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
---|