Details
Reactor Type | Pressurised Water Reactor (or PWR) |
---|---|
Model | EPR |
Owner | EDF |
Operator | EDF |
Timeline
Construction Start | Monday, 3 December 2007 |
---|---|
First Criticality | Tuesday, 3 September 2024 |
Specifications
Capacity Net | 1630 MWe |
---|---|
Capacity Gross | 1650 MWe |
Thermal Capacity | 4300 MWt |
Design Net Capacity | 1630 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
---|