Details
| Reactor Type | Pressurized Water Reactor (or PWR) |
|---|---|
| Model | EPR-1750 |
| Owner | Edf Energy - China General Nuclear Joint Venture |
| Operator | Edf Energy - China General Nuclear Joint Venture |
Timeline
| Construction Start | Thursday, 12 December 2019 |
|---|
Specifications
| Capacity Net | 1630 MWe |
|---|---|
| Capacity Gross | 1720 MWe |
| Thermal Capacity | 4524 MWt |
| Design Net Capacity | 1630 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
| Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
|---|