First nuclear concrete for the reactor was poured in 1987, but construction at the site is currently suspended. For more information see Nuclear Power in Ukraine

Details

Reactor Type Pressurized Water Reactor (or PWR)
Model VVER V-392B
Owner
Operator

Timeline

Construction Start Sunday, 1 February 1987

Specifications

Capacity Net 0 MWe
Capacity Gross 1089 MWe
Thermal Capacity 0 MWt
Design Net Capacity 0 MWe

Operational History

Electricity Supplied (GWh)

Energy Availability Factor (%)

Total Electricity Supplied (GWh)

Reactor History

Year Reference Unit Power (MWe) Annual Time Online (Hours) Electricity Supplied (GWh) Operation Factor (%) Energy Availability Annual (%) Energy Availability Cumulative (%) Load Factor Annual (%) Load Factor Cumulative (%)
Subscribe to receive updates on news