Details
| Reactor Type | Pressurized Water Reactor (or PWR) |
|---|---|
| Model | VVER V-213 |
| Owner | Slovenské Elektrárne, A.S. |
| Operator | Slovenské Elektrárne, A.S. |
Timeline
| Construction Start | Tuesday, 27 January 1987 |
|---|---|
| First Criticality | Tuesday, 22 November 2022 |
| First Grid Connection | Tuesday, 31 January 2023 |
| Commercial Operation |
Specifications
| Capacity Net | 434 MWe |
|---|---|
| Capacity Gross | 471 MWe |
| Thermal Capacity | 1375 MWt |
| Design Net Capacity | 440 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
| Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
|---|---|---|---|---|---|---|---|---|
| 2023 | 440 | 7416 | 1945.27 | - | - | - | - | - |
| 2024 | 434 | 6890 | 2841.27 | - | - | - | - | - |