Details
| Reactor Type | Pressurized Water Reactor (or PWR) |
|---|---|
| Model | APR-1400 |
| Owner | Korea Hydro And Nuclear Power Co. |
| Operator | Korea Hydro And Nuclear Power Co. |
Timeline
| Construction Start | Tuesday, 10 July 2012 |
|---|---|
| First Criticality | Sunday, 22 May 2022 |
| First Grid Connection | Thursday, 9 June 2022 |
| Commercial Operation | Wednesday, 7 December 2022 |
Specifications
| Capacity Net | 1429 MWe |
|---|---|
| Capacity Gross | 1455 MWe |
| Thermal Capacity | 3983 MWt |
| Design Net Capacity | 1340 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
| Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
|---|---|---|---|---|---|---|---|---|
| 2022 | 1414 | 3144 | 3090.99 | 100.00 | 100.00 | 100.00 | 100.10 | 100.10 |
| 2023 | 1414 | 8760 | 12319.20 | 100.00 | 99.30 | 99.30 | 99.50 | 99.50 |
| 2024 | 1429 | 5989 | 8368.94 | 68.20 | 66.70 | 83.60 | 66.70 | 83.60 |