Reactor Type Pressurised Water Reactor (or PWR)
Model ACPR-1000
Owner Jiangsu Nuclear Power Corporation
Operator Jiangsu Nuclear Power Corporation

Timeline

Construction Start Sunday, 27 December 2015
First Criticality Monday, 27 July 2020
First Grid Connection Saturday, 8 August 2020
Commercial Operation Tuesday, 8 September 2020

Specifications

Capacity Net 1060 MWe
Capacity Gross 1118 MWe
Thermal Capacity 2905 MWt
Design Net Capacity 1000 MWe

Operational History

Electricity Supplied (GWh)

Energy Availability Factor (%)

Total Electricity Supplied (GWh)

Reactor History

Year Reference Unit Power (MWe) Annual Time Online (Hours) Electricity Supplied (GWh) Operation Factor (%) Energy Availability Annual (%) Energy Availability Cumulative (%) Load Factor Annual (%) Load Factor Cumulative (%)
2020 1000 3383 2901.91 95.90 93.30 93.30 91.30 91.30
2021 1060 7400 7538.34 84.50 84.40 86.50 81.20 83.60
2022 1060 8760 8933.22 100.00 98.40 91.60 96.20 89.00
2023 1060 7864 8038.07 89.80 91.50 91.60 86.60 88.30

Source: Operating details - IAEA PRIS