| Reactor Type | Pressurized Water Reactor (or PWR) |
|---|---|
| Model | AP1000 |
| Owner | Georgia Power Co. |
| Operator | Southern Nuclear Operating Company, Inc. |
Timeline
| Construction Start | Tuesday, 19 November 2013 |
|---|---|
| First Criticality | Wednesday, 14 February 2024 |
| First Grid Connection | Friday, 1 March 2024 |
| Commercial Operation | Monday, 29 April 2024 |
Specifications
| Capacity Net | 1117 MWe |
|---|---|
| Capacity Gross | 1250 MWe |
| Thermal Capacity | 3400 MWt |
| Design Net Capacity | 1117 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
| Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
|---|---|---|---|---|---|---|---|---|
| 2024 | 1117 | 5787 | 5990.63 | 98.40 | 98.40 | 98.40 | 91.20 | 91.20 |