Also known as Zaporozhye-4, Zaporizhzhya-4

Details

Reactor Type Pressurized Water Reactor (or PWR)
Model VVER V-320
Owner
Operator

Timeline

Construction Start Friday, 1 April 1983
First Criticality Tuesday, 15 December 1987
First Grid Connection Friday, 18 December 1987
Commercial Operation Thursday, 14 April 1988

Specifications

Capacity Net 0 MWe
Capacity Gross 1000 MWe
Thermal Capacity 0 MWt
Design Net Capacity 0 MWe

Operational History

Electricity Supplied (GWh)

Energy Availability Factor (%)

Total Electricity Supplied (GWh)

Reactor History

Year Reference Unit Power (MWe) Annual Time Online (Hours) Electricity Supplied (GWh) Operation Factor (%) Energy Availability Annual (%) Energy Availability Cumulative (%) Load Factor Annual (%) Load Factor Cumulative (%)