The Akademik Lomononov provides heat to the town of Pevek and supplies electricity to the regional Chaun-Bilibino power system.
Details
Reactor Type | Pressurised Water Reactor (or PWR) |
---|---|
Model | KLT-40S 'Floating' |
Owner | Joint Stock Company 'Concern Rosenergoatom' |
Operator | Joint Stock Company 'Concern Rosenergoatom' |
Timeline
Construction Start | Sunday, 15 April 2007 |
---|---|
First Criticality | Friday, 2 November 2018 |
First Grid Connection | Thursday, 19 December 2019 |
Commercial Operation | Friday, 22 May 2020 |
Specifications
Capacity Net | 32 MWe |
---|---|
Capacity Gross | 35 MWe |
Thermal Capacity | 150 MWt |
Design Net Capacity | 30 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
---|---|---|---|---|---|---|---|---|
2019 | 32 | 312 | 0.68 | - | - | - | - | - |
2020 | 32 | 5138 | 64.93 | 71.60 | 90.40 | 90.40 | 28.80 | 28.80 |
2021 | 32 | 7104 | 125.26 | 81.10 | 85.10 | 87.00 | 44.70 | 38.80 |
2022 | 32 | 6367 | 74.13 | 72.70 | 50.00 | 72.70 | 26.40 | 34.00 |
2023 | 32 | 5143 | 74.63 | 58.70 | 33.00 | 61.70 | 26.60 | 32.00 |