Details

Reactor Type Pressurised Water Reactor (or PWR)
Model ACPR-1000
Owner Liaoning Hongyanhe Nuclear Power Co Ltd
Operator Liaoning Hongyanhe Nuclear Power Co Ltd

Timeline

Construction Start Friday, 24 July 2015
First Criticality Thursday, 21 April 2022
First Grid Connection Monday, 2 May 2022
Commercial Operation Thursday, 23 June 2022

Specifications

Capacity Net 1061 MWe
Capacity Gross 1119 MWe
Thermal Capacity 2905 MWt
Design Net Capacity 1061 MWe

Operational History

Electricity Supplied (GWh)

Energy Availability Factor (%)

Total Electricity Supplied (GWh)

Reactor History

Year Reference Unit Power (MWe) Annual Time Online (Hours) Electricity Supplied (GWh) Operation Factor (%) Energy Availability Annual (%) Energy Availability Cumulative (%) Load Factor Annual (%) Load Factor Cumulative (%)
2022 1061 5007 5000.45 88.50 97.80 97.80 81.80 81.80
2023 1061 7661 7701.66 87.40 85.60 89.70 82.90 82.50