Details
Reactor Type | Pressurised Water Reactor (or PWR) |
---|---|
Model | ACPR-1000 |
Owner | Liaoning Hongyanhe Nuclear Power Co Ltd |
Operator | Liaoning Hongyanhe Nuclear Power Co Ltd |
Timeline
Construction Start | Friday, 24 July 2015 |
---|---|
First Criticality | Thursday, 21 April 2022 |
First Grid Connection | Monday, 2 May 2022 |
Commercial Operation | Thursday, 23 June 2022 |
Specifications
Capacity Net | 1061 MWe |
---|---|
Capacity Gross | 1119 MWe |
Thermal Capacity | 2905 MWt |
Design Net Capacity | 1061 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
---|---|---|---|---|---|---|---|---|
2022 | 1061 | 5007 | 5000.45 | 88.50 | 97.80 | 97.80 | 81.80 | 81.80 |
2023 | 1061 | 7661 | 7701.66 | 87.40 | 85.60 | 89.70 | 82.90 | 82.50 |