Details

Reactor Type Pressurized Heavy Water Reactor (or PHWR)
Model CANDU 6
Owner Ministry Of Economy, Trade And Business Enviroment
Operator Societatea Nationala Nuclearelectrica, S.A.

Timeline

Construction Start Friday, 1 July 1983
First Criticality Sunday, 6 May 2007
First Grid Connection Tuesday, 7 August 2007
Commercial Operation Sunday, 28 October 2007

Specifications

Capacity Net 650 MWe
Capacity Gross 705 MWe
Thermal Capacity 2180 MWt
Design Net Capacity 650 MWe

Operational History

Electricity Supplied (GWh)

Energy Availability Factor (%)

Total Electricity Supplied (GWh)

Reactor History

Year Reference Unit Power (MWe) Annual Time Online (Hours) Electricity Supplied (GWh) Operation Factor (%) Energy Availability Annual (%) Energy Availability Cumulative (%) Load Factor Annual (%) Load Factor Cumulative (%)
2007 650 2729 1560.20 94.20 93.00 93.00 93.20 93.20
2008 650 8669 5528.11 98.70 96.80 96.30 96.80 96.30
2009 650 8044 5158.25 91.80 90.60 93.70 90.60 93.70
2010 650 8551 5537.52 97.60 96.90 94.70 97.20 94.80
2011 650 8052 5177.84 91.90 90.80 93.80 90.90 93.90
2012 650 8701 5615.32 99.10 98.10 94.60 98.40 94.70
2013 650 7905 5073.74 90.20 88.80 93.70 89.10 93.80
2014 650 8680 5589.30 99.10 98.00 94.30 98.20 94.40
2015 650 8179 5204.74 93.40 91.50 93.90 91.40 94.10
2016 650 8784 5622.38 100.00 98.50 94.40 98.50 94.50
2017 650 7963 5094.71 90.90 89.40 93.90 89.50 94.00
2018 650 8658 5530.84 98.80 97.20 94.20 97.10 94.30
2019 650 7910 5075.54 90.30 89.00 93.80 89.10 93.90
2020 650 8737 5611.82 99.50 98.20 94.10 98.30 94.20
2021 650 7742 4950.65 88.40 87.10 93.60 87.00 93.70
2022 650 8760 5615.46 100.00 98.50 94.00 98.60 94.00
2023 650 7686 4901.20 87.70 86.30 93.50 86.10 93.60

Source: Operating details - IAEA PRIS