Reactor Type Pressurised Water Reactor (or PWR)
Model M (2-loop)
Owner Shikoku Electric Power Co., Inc
Operator Shikoku Electric Power Co., Inc

Timeline

Construction Start Saturday, 1 September 1973
First Criticality Saturday, 29 January 1977
First Grid Connection Thursday, 17 February 1977
Commercial Operation Friday, 30 September 1977
Permanent Shutdown Tuesday, 10 May 2016

Specifications

Capacity Net 538 MWe
Capacity Gross 566 MWe
Thermal Capacity 1650 MWt
Design Net Capacity 538 MWe

Operational History

Electricity Supplied (GWh)

Energy Availability Factor (%)

Total Electricity Supplied (GWh)

Reactor History

Year Reference Unit Power (MWe) Annual Time Online (Hours) Electricity Supplied (GWh) Operation Factor (%) Energy Availability Annual (%) Energy Availability Cumulative (%) Load Factor Annual (%) Load Factor Cumulative (%)
1977 538 5901 2306.20 100.00 95.10 95.10 95.10 95.10
1978 538 6272 3138.00 71.60 66.60 72.30 66.60 72.30
1979 538 4984 2564.50 56.90 54.40 64.40 54.40 64.40
1980 538 6006 3127.40 68.40 66.20 64.90 66.20 64.90
1981 538 6253 3236.80 71.40 68.70 65.80 68.70 65.80
1982 538 6662 3527.30 76.00 74.80 67.50 74.80 67.50
1983 538 8754 4667.60 99.90 99.00 72.60 99.00 72.60
1984 538 6283 3318.21 71.50 70.50 72.30 70.20 72.20
1985 538 6962 3674.14 79.50 78.20 73.00 78.00 72.90
1986 538 7044 3719.55 80.40 79.20 73.70 78.90 73.60
1987 538 8760 4695.96 100.00 100.00 76.20 99.60 76.10
1988 538 6719 3533.93 76.50 75.00 76.10 74.80 76.00
1989 538 6791 3563.64 77.50 76.20 76.10 75.60 76.00
1990 538 6932 3632.24 79.10 76.40 76.20 77.10 76.00
1991 538 8184 4382.38 93.40 93.40 77.40 93.00 77.20
1992 538 6995 3675.42 79.60 78.50 77.40 77.80 77.30
1993 538 6630 3494.25 75.70 74.40 77.20 74.10 77.10
1994 538 6717 3601.31 76.70 76.60 77.20 76.40 77.00
1995 538 6815 3598.73 77.80 76.50 77.20 76.40 77.00
1996 538 6768 3579.12 77.00 75.90 77.10 75.70 76.90
1997 538 8760 4688.91 100.00 99.70 78.20 99.50 78.00
1998 538 6127 3239.24 69.90 68.90 77.80 68.70 77.60
1999 538 7051 3783.18 80.50 80.40 77.90 80.30 77.70
2000 538 5953 3194.09 67.80 67.70 77.50 67.60 77.30
2001 538 8412 4477.59 96.00 95.20 78.20 95.00 78.00
2002 538 6505 3527.93 74.30 74.20 78.00 74.90 77.90
2003 538 6819 3734.59 77.80 77.80 78.00 79.20 78.00
2004 538 5949 3249.64 67.70 67.60 77.60 68.80 77.60
2005 538 7949 4267.90 90.70 90.20 78.10 90.60 78.10
2006 538 6465 3461.25 73.80 73.20 77.90 73.40 77.90
2007 538 7259 3919.43 82.90 82.50 78.10 83.20 78.10
2008 538 7403 3980.22 84.30 83.70 78.20 84.20 78.30
2009 538 5731 3081.74 65.40 65.10 77.80 65.40 77.90
2010 538 7329 3952.97 83.70 83.30 78.00 83.90 78.10
2011 538 5904 3199.72 67.40 67.30 77.70 67.90 77.80
2012 538 0 0.00 0.00 0.10 75.50 0.00 75.60
2013 538 0 0.00 0.00 0.00 73.40 0.00 73.50
2014 538 0 0.00 0.00 0.00 71.40 0.00 71.50
2015 538 0 0.00 0.00 0.00 69.60 0.00 69.60
2016 538 0 0.00 0.00 0.00 69.00 0.00 69.00

Source: Operating details - IAEA PRIS