Also known as Khmelnytskyi-3
Details
Reactor Type | Pressurised Water Reactor (or PWR) |
---|---|
Model | VVER V-392B |
Owner | Se “Nnegc “Energoatom” |
Operator | State Enterprise “National Nuclear Energy Generating Company ‘Energoatom” |
Timeline
Construction Start | Saturday, 1 March 1986 |
---|
Specifications
Capacity Net | 1035 MWe |
---|---|
Capacity Gross | 1089 MWe |
Thermal Capacity | 3132 MWt |
Design Net Capacity | 1035 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
---|