Details
Reactor Type | Pressurised Water Reactor (or PWR) |
---|---|
Model | CAP1000 |
Owner | China Power Investment Group |
Operator | Zhanjiang Nuclear Power Company, Ltd. |
Timeline
Construction Start | Friday, 26 April 2024 |
---|
Specifications
Capacity Net | 1161 MWe |
---|---|
Capacity Gross | 1250 MWe |
Thermal Capacity | 3400 MWt |
Design Net Capacity | 1161 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
---|