Reactor Type | Pressurised Water Reactor (or PWR) |
---|---|
Model | PWR |
Owner | SCN |
Operator | Kernkraftwerk Gundremmingen Gmbh |
Timeline
Construction Start | Wednesday, 15 January 1975 |
---|---|
First Criticality | Saturday, 1 March 1986 |
First Grid Connection | Friday, 14 March 1986 |
Commercial Operation | Tuesday, 18 August 1987 |
Permanent Shutdown | Friday, 9 September 1988 |
Specifications
Capacity Net | 1219 MWe |
---|---|
Capacity Gross | 1302 MWe |
Thermal Capacity | 3760 MWt |
Design Net Capacity | 1219 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
---|---|---|---|---|---|---|---|---|
1986 | 1165 | 0 | 1357.59 | - | - | - | - | - |
1987 | 1165 | 1564 | 2904.30 | 42.60 | 92.90 | 92.90 | 67.90 | 67.90 |