First nuclear concrete for the reactor was poured in 2010, but construction at the site is currently suspended. For more information see Nuclear Power in Japan

Details

Reactor Type Boiling Water Reactor (or BWR)
Model ABWR
Owner Electric Power Development Co., Ltd.
Operator Electric Power Development Co., Ltd.

Timeline

Construction Start Friday, 7 May 2010

Specifications

Capacity Net 1328 MWe
Capacity Gross 1383 MWe
Thermal Capacity 3926 MWt
Design Net Capacity 1328 MWe

Operational History

Electricity Supplied (GWh)

Energy Availability Factor (%)

Total Electricity Supplied (GWh)

Reactor History

Year Reference Unit Power (MWe) Annual Time Online (Hours) Electricity Supplied (GWh) Operation Factor (%) Energy Availability Annual (%) Energy Availability Cumulative (%) Load Factor Annual (%) Load Factor Cumulative (%)

Source: Operating details - IAEA PRIS


See Also

Nuclear Power in Japan

Related News

WNN articles on Japan
Subscribe to receive updates on news