First nuclear concrete for the reactor was poured in 2006, but construction at the site is currently suspended. For more information see Nuclear Power in Japan
Details
| Reactor Type | Boiling Water Reactor (or BWR) |
|---|---|
| Model | ABWR |
| Owner | The Chugoku Electric Power Co., Inc. |
| Operator | The Chugoku Electric Power Co., Inc. |
Timeline
| Construction Start | Tuesday, 24 October 2006 |
|---|
Specifications
| Capacity Net | 1325 MWe |
|---|---|
| Capacity Gross | 1373 MWe |
| Thermal Capacity | 3926 MWt |
| Design Net Capacity | 1325 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
| Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
|---|