Nuclear Reactors in India

24
Operable
Reactors
7,935 MWe
3%
Nuclear Share
of Generation
49,910 GWh (2024)
8
Reactors Under
Construction
6,028 MWe

Total Operable Nuclear Capacity

Total Electricity Generated

All Operable Reactors

Reactor Name Model Process Capacity (MWe) Grid Connection Load Factor (2025) (%) Electricity Generated (2025) (GWh)
Kaiga 1 Horizontal Pressure Tube type PHWR 202 12/10/2000 22.60 400.23
Kaiga 2 Horizontal Pressure Tube type PHWR 202 02/12/1999 81.60 1443.84
Kaiga 3 Horizontal Pressure Tube type PHWR 202 11/04/2007 94.80 1676.83
Kaiga 4 Horizontal Pressure Tube type PHWR 202 19/01/2011 105.00 1857.26
Kakrapar 1 Horizontal Pressure Tube type PHWR 202 24/11/1992 96.00 1698.85
Kakrapar 2 Horizontal Pressure Tube type PHWR 202 04/03/1995 79.30 1403.93
Kakrapar 3 PHWR-700 PHWR 630 10/01/2021 82.50 4553.38
Kakrapar 4 PHWR-700 PHWR 630 20/02/2024 70.10 3867.54
Kudankulam 1 VVER V-412 PWR 932 22/10/2013 83.80 6838.83
Kudankulam 2 VVER V-412 PWR 932 29/08/2016 83.50 6817.82
Madras 1 Horizontal Pressure Tube type PHWR 205 23/07/1983 0.00 0.00
Madras 2 Horizontal Pressure Tube type PHWR 205 20/09/1985 63.20 1135.35
Narora 1 Horizontal Pressure Tube type PHWR 202 29/07/1989 44.30 783.99
Narora 2 Horizontal Pressure Tube type PHWR 202 05/01/1992 90.00 1591.78
Rajasthan 2 Horizontal Pressure Tube type PHWR 187 01/11/1980 57.50 942.62
Rajasthan 3 Horizontal Pressure Tube type PHWR 202 10/03/2000 85.10 1505.49
Rajasthan 4 Horizontal Pressure Tube type PHWR 202 17/11/2000 81.00 1433.76
Rajasthan 5 Horizontal Pressure Tube type PHWR 202 22/12/2009 89.50 1584.39
Rajasthan 6 Horizontal Pressure Tube type PHWR 202 28/03/2010 99.50 1760.30
Rajasthan 7 Horizontal Pressure Tube type PHWR 630 17/03/2025 32.00 1359.47
Tarapur 1 BWR-1 (Mark 2) BWR 150 01/04/1969
Tarapur 2 BWR-1 (Mark 2) BWR 150 05/05/1969
Tarapur 3 Horizontal Pressure Tube Type PHWR 482 15/06/2006 84.00 3546.86
Tarapur 4 Horizontal Pressure Tube Type PHWR 378 04/06/2005 83.40 2895.49

All Under Construction Reactors

Reactor Name Model Process Capacity (MWe) Construction Start
Kaiga 5 Horizontal Pressure Tube type PHWR 630 01/03/2026
Kaiga 6 Horizontal Pressure Tube type PHWR 630 01/03/2026
Kudankulam 3 VVER V-412 PWR 917 29/06/2017
Kudankulam 4 VVER V-412 PWR 917 23/10/2017
Kudankulam 5 VVER V-412 PWR 917 29/06/2021
Kudankulam 6 VVER V-412 PWR 917 20/12/2021
PFBR Prototype FBR 470 23/10/2004
Rajasthan 8 Horizontal Pressure Tube type PHWR 630 30/09/2011

All Permanent Shutdown Reactors

Reactor Name Model Process Net Capacity (MWe) Permanent Shutdown
Rajasthan 1 Horizontal Pressure Tube type PHWR 134 09/10/2004