440
Operable
Reactors
396,269 MWe
61
Reactors Under
Construction
64,159 MWe
214
Reactors
Shutdown
106,259 MWe

Total Operable Nuclear Capacity

Total Electricity Generated

Top Operable Reactor Net Capacity By Country

Top Under Construction Reactor Net Capacity By Country

Top Load Factor (2022)

Reactor Name Model Process Capacity (MWe) Load Factor (2022) (%) Location
Sendai 2 M (3-loop) PWR 846 108.10 Japan
Turkey Point 4 W (3-loop) DRYAMB PWR 821 105.30 United States Of America
Kalinin 2 VVER V-338 PWR 950 104.40 Russia
Prairie Island 1 W (2-loop) DRYAMB PWR 522 104.40 United States Of America
Kalinin 4 VVER V-320 PWR 950 104.20 Russia
Browns Ferry 1 BWR-4 (Mark 1) BWR 1200 103.70 United States Of America
Fitzpatrick BWR-4 (Mark 1) BWR 813 103.50 United States Of America
Kaiga 4 Horizontal Pressure Tube type PHWR 202 103.40 India
Browns Ferry 3 BWR-4 (Mark 1) BWR 1210 103.00 United States Of America
Bruce 4 CANDU 750A PHWR 769 102.80 Canada

Top Generation (2022)

Reactor Name Model Process Net Capacity (MWe) Total Generation (2022) (GWh) Location
Saeul 1 APR-1400 PWR 1416 12328.84 South Korea
Isar 2 Konvoi PWR 1410 11610.81 Germany
South Texas Project 1 W (4-loop) PWR 1280 11593.44 United States Of America
Peach Bottom 3 BWR-4 (Mark 1) BWR 1331 11531.32 United States Of America
Palo Verde 2 COMB CE80 DRYAMB PWR 1314 11192.86 United States Of America
Browns Ferry 2 BWR-4 (Mark 1) BWR 1200 10981.47 United States Of America
Seabrook 1 W (4-loop) DRYAMB PWR 1246 10921.11 United States Of America
Golfech 2 P4 REP 1300 PWR 1310 10693.10 France
Peach Bottom 2 BWR-4 (Mark 1) BWR 1300 10652.64 United States Of America
Susquehanna Steam Electric Station 2 BWR-4 (Mark 2) BWR 1257 10634.60 United States Of America

All Operable Reactors

Reactor Name Model Process Capacity (MWe) Grid Connection Load Factor (2022) (%) Electricity Generated (2022) (GWh)
Armenian 2 VVER V-270 PWR 416 05/01/1980 72.20 2630.85
Atucha 1 PHWR KWU PHWR 340 19/03/1974 68.30 2034.01
Embalse CANDU 6 PHWR 608 25/04/1983 78.40 4176.48
Atucha 2 PHWR KWU PHWR 693 24/06/2014 20.70 1259.03
Doel 1 W (2-loop) PWR 445 28/08/1974 91.10 3551.15
Tihange 1 Framatome 3 loops reactor PWR 962 07/03/1975 55.60 4685.63
Doel 2 W (2-loop) PWR 445 21/08/1975 90.80 3538.97
Doel 4 W (3-loop) PWR 1026 08/04/1985 98.30 8940.45
Tihange 3 W (3-loop) PWR 1038 15/06/1985 81.00 7366.37
Kozloduy 5 VVER V-320 PWR 1003 29/11/1987 92.20 8104.37
Kozloduy 6 VVER V-320 PWR 1003 02/08/1991 87.40 7679.72
Angra 1 2-loop WE PWR 609 01/04/1982 86.30 4602.31
Angra 2 PRE KONVOI PWR 1275 21/07/2000 81.90 9142.51
Bruce 3 CANDU 750A PHWR 770 12/12/1977 92.20 6220.67
Bruce 4 CANDU 750A PHWR 769 21/12/1978 69.80 4701.86
Pickering 5 CANDU 500B PHWR 516 19/12/1982 52.80 2386.74
Pickering 6 CANDU 500B PHWR 516 08/11/1983 89.00 4022.03
Pickering 7 CANDU 500B PHWR 516 17/11/1984 92.10 4161.58
Pickering 8 CANDU 500B PHWR 516 21/01/1986 87.20 3941.06
Point Lepreau CANDU 6 PHWR 660 11/09/1982 61.40 3546.75
Bruce 5 CANDU 750B PHWR 817 02/12/1984 76.40 5465.11
Bruce 6 CANDU 750B PHWR 817 26/06/1984 0.00 0.00
Bruce 7 CANDU 750B PHWR 817 22/02/1986 93.30 6676.03
Bruce 8 CANDU 750B PHWR 817 09/03/1987 97.60 6985.60
Darlington 1 CANDU 850 PHWR 878 19/12/1990 12.30 943.49
Darlington 2 CANDU 850 PHWR 878 15/01/1990 77.80 5985.00
Darlington 3 CANDU 850 PHWR 878 07/12/1992 0.00 0.00
Darlington 4 CANDU 850 PHWR 878 17/04/1993 93.10 7159.58
Pickering 1 CANDU 500A PHWR 515 04/04/1971 66.20 2986.96
Pickering 4 CANDU 500A PHWR 515 21/05/1973 87.90 3965.81
Bruce 1 CANDU 791 PHWR 811 14/01/1977 98.70 6691.27
Bruce 2 CANDU 791 PHWR 777 04/09/1976 86.40 5878.11
Beznau 1 W (2-loop) PWR 365 17/07/1969 80.20 2564.59
Beznau 2 W (2-loop) PWR 365 23/10/1971 93.00 2974.93
Goesgen PWR 3 Loop PWR 1010 02/02/1979 89.10 7886.66
Leibstadt BWR-6 BWR 1233 24/05/1984 90.30 9753.38
Qinshan 1 CNP-300 PWR 326 15/12/1991 91.20 2603.50
Daya Bay 1 M310 PWR 944 31/08/1993 92.70 7666.03
Daya Bay 2 M310 PWR 944 07/02/1994 93.90 7767.89
Qinshan 2 1 CNP-600 PWR 623 06/02/2002 89.70 4897.42
Qinshan 2 2 CNP-600 PWR 623 11/03/2004 94.80 5064.37
Ling Ao 1 M310 PWR 950 26/02/2002 80.60 6706.96
Ling Ao 2 M310 PWR 950 14/09/2002 91.20 7593.07
Qinshan 3 1 CANDU 6 PHWR 677 19/11/2002 97.40 5778.63
Temelin 1 VVER V-320 PWR 1086 21/12/2000 86.00 7733.58
Temelin 2 VVER V-320 PWR 1086 29/12/2002 86.00 7751.47
Dukovany 1 VVER V-213 PWR 510 24/02/1985 85.10 3490.34
Dukovany 2 VVER V-213 PWR 510 30/01/1986 82.40 3401.12
Dukovany 3 VVER V-213 PWR 510 14/11/1986 84.80 3477.43
Dukovany 4 VVER V-213 PWR 510 11/06/1987 83.80 3456.36
Cofrentes BWR-6 BWR 1064 14/10/1984 89.50 8344.99
Trillo 1 PWR 3 loops PWR 1003 23/05/1988 87.40 7679.74
Vandellos 2 W (3-loop) PWR 1047 12/12/1987 86.10 7897.80
Almaraz 1 W (3-loop) PWR 1011 01/05/1981 95.20 8427.99
Almaraz 2 W (3-loop) PWR 1006 08/10/1983 86.30 7604.97
Asco 1 W (3-loop) PWR 995 13/08/1983 97.90 8532.56
Asco 2 W (3-loop) PWR 997 23/10/1985 87.70 7662.31
Loviisa 1 VVER V-213 PWR 507 08/02/1977 90.00 3995.96
Loviisa 2 VVER V-213 PWR 507 04/11/1980 87.70 3894.87
Olkiluoto 1 ABB-III, BWR-2500 BWR 890 02/09/1978 88.90 6931.89
Olkiluoto 2 ABB-III, BWR-2500 BWR 890 18/02/1980 96.60 7532.48
Bugey 2 CP0 PWR 910 10/05/1978 54.20 4317.13
Bugey 3 CP0 PWR 910 21/09/1978 62.50 4981.07
Bugey 4 CP0 PWR 880 08/03/1979 36.90 2846.18
Bugey 5 CP0 PWR 880 31/07/1979 55.10 4244.17
St. Laurent B 1 CP2 PWR 915 21/01/1981 82.60 6616.63
Tricastin 1 CP1 PWR 915 31/05/1980 80.80 6479.64
Tricastin 2 CP1 PWR 915 07/08/1980 88.30 7074.48
Gravelines 1 CP1 PWR 910 13/03/1980 62.90 5015.76
Gravelines 2 CP1 PWR 910 26/08/1980 75.40 6014.85
Dampierre 1 CP1 PWR 890 23/03/1980 70.90 5530.96
St. Laurent B 2 CP2 PWR 915 01/06/1981 34.40 2756.21
Tricastin 3 CP1 PWR 915 10/02/1981 29.40 2357.63
Tricastin 4 CP1 PWR 915 12/06/1981 67.50 5407.68
Gravelines 3 CP1 PWR 910 12/12/1980 19.40 1550.09
Gravelines 4 CP1 PWR 910 14/06/1981 74.50 5937.41
Dampierre 2 CP1 PWR 890 10/12/1980 23.80 1855.50
Dampierre 3 CP1 PWR 890 30/01/1981 80.00 6238.98
Dampierre 4 CP1 PWR 890 18/08/1981 64.60 5033.31
Blayais 1 CP1 PWR 910 12/06/1981 54.60 4354.20
Blayais 2 CP1 PWR 910 17/07/1982 79.30 6323.87
Blayais 3 CP1 PWR 910 17/08/1983 66.60 5310.70
Blayais 4 CP1 PWR 910 16/05/1983 77.00 6137.48
Paluel 1 P4 REP 1300 PWR 1330 22/06/1984 88.50 10306.63
Paluel 2 P4 REP 1300 PWR 1330 14/09/1984 45.20 5266.59
Paluel 3 P4 REP 1300 PWR 1330 30/09/1985 90.90 10585.79
Paluel 4 P4 REP 1300 PWR 1330 11/04/1986 57.90 6745.15
Chinon B 1 CP2 PWR 905 30/11/1982 81.60 6467.62
Chinon B 2 CP2 PWR 905 29/11/1983 64.10 5078.62
Cruas 1 CP2 PWR 915 29/04/1983 85.80 6879.40
Cruas 2 CP2 PWR 915 06/09/1984 67.20 5384.34
Cruas 3 CP2 PWR 915 14/05/1984 53.90 4322.15
Cruas 4 CP2 PWR 915 27/10/1984 45.80 3668.57
Flamanville 1 P4 REP 1300 PWR 1330 04/12/1985 20.10 2342.90
Flamanville 2 P4 REP 1300 PWR 1330 18/07/1986 16.40 1910.62
St. Alban 1 P4 REP 1300 PWR 1335 30/08/1985 86.50 10111.34
St. Alban 2 P4 REP 1300 PWR 1335 03/07/1986 50.70 5931.74
Cattenom 1 P4 REP 1300 PWR 1300 13/11/1986 43.00 4896.26
Gravelines 5 CP1 PWR 910 28/08/1984 54.00 4304.69
Gravelines 6 CP1 PWR 910 01/08/1985 70.30 5604.12
Cattenom 2 P4 REP 1300 PWR 1300 17/09/1987 91.20 10380.51
Belleville 1 P4 REP 1300 PWR 1310 14/10/1987 74.80 8586.60
Belleville 2 P4 REP 1300 PWR 1310 06/07/1988 67.80 7778.25
Chinon B 3 CP2 PWR 905 20/10/1986 24.90 1976.92
Chinon B 4 CP2 PWR 905 14/11/1987 72.30 5732.97
Nogent 1 P4 REP 1300 PWR 1310 21/10/1987 71.60 8212.68
Nogent 2 P4 REP 1300 PWR 1310 14/12/1988 86.40 9909.52
Cattenom 3 P4 REP 1300 PWR 1300 06/07/1990 21.70 2472.54
Golfech 1 P4 REP 1300 PWR 1310 07/06/1990 13.50 1546.16
Chooz B 1 N4 REP 1450 PWR 1500 30/08/1996 0.00 0.00
Penly 1 P4 REP 1300 PWR 1330 04/05/1990 0.00 0.00
Penly 2 P4 REP 1300 PWR 1330 04/02/1992 57.90 6747.56
Cattenom 4 P4 REP 1300 PWR 1300 27/05/1991 16.40 1865.96
Golfech 2 P4 REP 1300 PWR 1310 18/06/1993 93.20 10693.10
Chooz B 2 N4 REP 1450 PWR 1500 10/04/1997 0.00 0.00
Civaux 1 N4 REP 1450 PWR 1495 24/12/1997 0.00 0.00
Civaux 2 N4 REP 1450 PWR 1495 24/12/1999 0.00 0.00
Hartlepool A 1 AGR GCR 590 01/08/1983 69.20 3574.26
Hartlepool A 2 AGR GCR 595 31/10/1984 79.30 4132.36
Heysham A 1 AGR GCR 485 09/07/1983 84.00 3567.83
Heysham A 2 AGR GCR 575 11/10/1984 54.80 2762.77
Heysham B 1 AGR GCR 620 12/07/1988 68.10 3697.11
Heysham B 2 AGR GCR 620 11/11/1988 77.60 4213.26
Torness 1 AGR GCR 595 25/05/1988 78.30 4079.44
Torness 2 AGR GCR 605 03/02/1989 58.00 3076.41
Sizewell B SNUPPS PWR 1198 14/02/1995 98.70 10357.17
Paks 1 VVER V-213 PWR 479 28/12/1982 81.70 3428.09
Paks 2 VVER V-213 PWR 479 06/09/1984 97.10 4074.98
Paks 3 VVER V-213 PWR 479 28/09/1986 92.60 3886.48
Paks 4 VVER V-213 PWR 479 16/08/1987 85.00 3564.70
Tarapur 1 BWR-1 (Mark 2) BWR 150 01/04/1969 0.00 0.00
Kakrapar 2 Horizontal Pressure Tube type PHWR 202 04/03/1995 95.30 1685.86
Rajasthan 3 Horizontal Pressure Tube type PHWR 202 10/03/2000 67.70 1197.78
Rajasthan 4 Horizontal Pressure Tube type PHWR 202 17/11/2000 58.80 1039.61
Kaiga 1 Horizontal Pressure Tube type PHWR 202 12/10/2000 94.50 1671.76
Kaiga 2 Horizontal Pressure Tube type PHWR 202 02/12/1999 86.60 1532.82
Kaiga 3 Horizontal Pressure Tube type PHWR 202 11/04/2007 106.00 1875.28
Kaiga 4 Horizontal Pressure Tube type PHWR 202 19/01/2011 94.40 1670.85
Rajasthan 5 Horizontal Pressure Tube type PHWR 202 22/12/2009 94.20 1665.99
Tarapur 2 BWR-1 (Mark 2) BWR 150 05/05/1969 0.00 0.00
Rajasthan 6 Horizontal Pressure Tube type PHWR 202 28/03/2010 97.70 1728.96
Tarapur 3 Horizontal Pressure Tube Type PHWR 490 15/06/2006 84.40 3621.42
Tarapur 4 Horizontal Pressure Tube Type PHWR 490 04/06/2005 96.30 4133.62
Rajasthan 2 Horizontal Pressure Tube type PHWR 187 01/11/1980 57.40 940.72
Madras 1 Horizontal Pressure Tube type PHWR 205 23/07/1983
Madras 2 Horizontal Pressure Tube type PHWR 205 20/09/1985 87.00 1562.48
Narora 1 Horizontal Pressure Tube type PHWR 202 29/07/1989 78.80 1394.87
Narora 2 Horizontal Pressure Tube type PHWR 202 05/01/1992 83.30 1474.35
Kakrapar 1 Horizontal Pressure Tube type PHWR 202 24/11/1992 91.40 1617.43
Bushehr 1 VVER V-446 PWR 915 03/09/2011 75.00 6008.02
Takahama 2 M (3-loop) PWR 780 17/01/1975
Mihama 3 M (3-loop) PWR 780 19/02/1976 34.30 2343.68
Tokai 2 BWR-5 BWR 1060 13/03/1978
Sendai 1 M (3-loop) PWR 846 16/09/1983 108.10 8012.33
Takahama 3 M (3-loop) PWR 830 09/05/1984 62.40 4534.48
Takahama 4 M (3-loop) PWR 830 01/11/1984 61.90 4502.02
Kashiwazaki Kariwa 1 BWR-5 BWR 1067 13/02/1985
Tsuruga 2 M (4-loop) PWR 1108 19/06/1986
Hamaoka 3 BWR-5 BWR 1056 20/01/1987
Sendai 2 M (3-loop) PWR 846 05/04/1985 74.10 5488.22
Kashiwazaki Kariwa 2 BWR-5 BWR 1067 08/02/1990
Kashiwazaki Kariwa 5 BWR-5 BWR 1067 12/09/1989
Shimane 2 BWR-5 BWR 789 11/07/1988
Tomari 1 M (2-loop) PWR 550 06/12/1988
Tomari 2 M (2-loop) PWR 550 27/08/1990
Genkai 3 M (4-loop) PWR 1127 15/06/1993 10.50 1036.79
Genkai 4 M (4-loop) PWR 1127 12/11/1996 49.50 4888.76
Ikata 3 M (3-loop) PWR 846 29/03/1994 103.80 7695.11
Shika 1 BWR-5 BWR 505 12/01/1993
Hamaoka 4 BWR-5 BWR 1092 27/01/1993
Ohi 3 M (4-loop) PWR 1127 07/06/1991 69.60 6869.56
Ohi 4 M (4-loop) PWR 1127 19/06/1992 66.20 6536.56
Kashiwazaki Kariwa 3 BWR-5 BWR 1067 08/12/1992
Kashiwazaki Kariwa 4 BWR-5 BWR 1067 21/12/1993
Onagawa 2 BWR-5 BWR 796 23/12/1994
Kashiwazaki Kariwa 6 ABWR BWR 1315 29/01/1996
Kashiwazaki Kariwa 7 ABWR BWR 1315 17/12/1996
Onagawa 3 BWR-5 BWR 796 30/05/2001
Takahama 1 M (3-loop) PWR 780 27/03/1974
Hanul 2 France CPI PWR 967 14/04/1989 99.50 8427.91
Hanbit 3 OPR-1000 PWR 986 30/10/1994 60.80 5249.90
Hanbit 4 OPR-1000 PWR 970 18/07/1995 5.30 452.16
Hanul 3 OPR-1000 PWR 997 06/01/1998 97.70 8531.57
Hanul 4 OPR-1000 PWR 999 28/12/1998 99.00 8667.91
Wolsong 3 CANDU 6 PHWR 601 25/03/1998 88.40 4686.17
Wolsong 4 CANDU 6 PHWR 567 21/05/1999 101.20 5086.51
Hanbit 5 OPR-1000 PWR 992 19/12/2001 99.80 8671.23
Hanbit 6 OPR-1000 PWR 993 16/09/2002 73.40 6389.15
Hanul 5 OPR-1000 PWR 998 18/12/2003 77.90 6809.01
Kori 2 WH F PWR 640 22/04/1983 64.20 3598.82
Hanul 6 OPR-1000 PWR 997 07/01/2005 85.80 7496.12
Wolsong 2 CANDU 6 PHWR 576 01/04/1997 41.30 2059.85
Kori 3 WH F PWR 1011 22/01/1985 96.70 8560.23
Kori 4 WH F PWR 1012 15/11/1985 99.40 8807.27
Hanbit 1 WH F PWR 995 05/03/1986 68.30 5955.26
Hanbit 2 WH F PWR 988 11/11/1986 61.80 5348.60
Hanul 1 France CPI PWR 966 07/04/1988 84.70 7165.36
Laguna Verde 1 BWR-5 BWR 777 13/04/1989 81.40 5537.79
Laguna Verde 2 BWR-5 BWR 775 11/11/1994 73.70 5001.67
Borssele 2-loops KWU PWR 482 04/07/1973 93.10 3930.56
Chashma Nuclear Power Plant 1 CNP-300 PWR 300 13/06/2000 88.70 2330.60
Chashma Nuclear Power Plant 2 CNP-300 PWR 300 14/03/2011 90.80 2384.88
Cernavoda 1 CANDU 6 PHWR 650 11/07/1996 80.90 4606.58
Cernavoda 2 CANDU 6 PHWR 650 07/08/2007 98.60 5615.46
Novovoronezh 4 VVER V-179 PWR 385 28/12/1972 65.20 2199.85
Beloyarsk 4 BN-800 FBR 820 10/12/2015 72.00 5174.47
Kola 1 VVER V-230 PWR 411 29/06/1973 61.50 2215.25
Kola 2 VVER V-230 PWR 411 09/12/1974 60.80 2190.58
Bilibino 2 EGP-6 LWGR 11 30/12/1974 33.80 32.58
Bilibino 3 EGP-6 LWGR 11 22/12/1975 23.90 23.07
Bilibino 4 EGP-6 LWGR 11 27/12/1976 28.10 27.07
Novovoronezh 5 VVER V-187 PWR 950 31/05/1980 87.90 7312.92
Beloyarsk 3 BN-600 FBR 560 08/04/1980 74.80 3670.83
Smolensk 1 RBMK-1000 LWGR 925 09/12/1982 81.40 6594.48
Smolensk 2 RBMK-1000 LWGR 925 31/05/1985 82.00 6641.85
Kalinin 1 VVER V-338 PWR 950 09/05/1984 106.50 8863.93
Kalinin 2 VVER V-338 PWR 950 03/12/1986 88.10 7334.10
Kola 3 VVER V-213 PWR 411 24/03/1981 76.10 2739.16
Kola 4 VVER V-213 PWR 411 11/10/1984 69.80 2512.64
Leningrad 3 RBMK-1000 LWGR 925 07/12/1979 85.70 6944.66
Leningrad 4 RBMK-1000 LWGR 925 09/02/1981 84.40 6839.10
Kalinin 3 VVER V-320 PWR 950 16/12/2004 82.60 6877.28
Kalinin 4 VVER V-320 PWR 950 24/11/2011 95.20 7923.02
Kursk 3 RBMK-1000 LWGR 925 17/10/1983 74.50 6036.61
Kursk 4 RBMK-1000 LWGR 925 02/12/1985 70.00 5672.23
Rostov 1 VVER V-320 PWR 989 30/03/2001 101.00 8753.70
Rostov 2 VVER V-320 PWR 950 18/03/2010 106.50 8865.36
Rostov 3 VVER V-320 PWR 950 27/12/2014 96.40 8018.57
Rostov 4 VVER V-320 PWR 979 02/02/2018 87.90 7542.06
Smolensk 3 RBMK-1000 LWGR 925 17/01/1990 79.80 6464.67
Balakovo 1 VVER V-320 PWR 950 28/12/1985 105.60 8788.05
Balakovo 2 VVER V-320 PWR 950 08/10/1987 102.40 8519.78
Balakovo 3 VVER V-320 PWR 950 25/12/1988 105.00 8734.40
Balakovo 4 VVER V-320 PWR 950 11/04/1993 98.10 8167.11
Ringhals 4 W (3-loops) PWR 1130 23/06/1982 58.80 5819.96
Forsmark 2 ABB-III, BWR-2500 BWR 1121 26/01/1981 91.60 8998.04
Oskarshamn 3 ABB-III, BWR-3000 BWR 1400 03/03/1985 84.90 10414.56
Forsmark 3 ABB-III, BWR-3000 BWR 1172 05/03/1985 91.40 9379.92
Ringhals 3 W (3-loops) PWR 1081 07/09/1980 86.60 8151.85
Forsmark 1 ABB-III, BWR-2500 BWR 1040 06/06/1980 82.90 7253.90
Krsko WE 212 PWR 688 02/10/1981 88.10 5310.70
Mochovce 3 VVER V-213 PWR 440 31/01/2023
Bohunice 3 VVER V-213 PWR 466 20/08/1984 89.10 3637.81
Bohunice 4 VVER V-213 PWR 466 09/08/1985 89.10 3638.00
Mochovce 1 VVER V-213 PWR 467 04/07/1998 91.80 3753.95
Mochovce 2 VVER V-213 PWR 469 20/12/1999 92.50 3800.50
Maanshan 1 WE 312 (3 loop-12 foot) PWR 936 09/05/1984 87.80 7197.97
Maanshan 2 WE 312 (3 loop-12 foot) PWR 938 25/02/1985 99.90 8206.47
Zaporizhzhia 5 VVER V-320 PWR 950 14/08/1989
Zaporizhzhia 6 VVER V-320 PWR 950 19/10/1995
Rivne 1 VVER V-213 PWR 381 22/12/1980
Rivne 2 VVER V-213 PWR 376 22/12/1981
Rivne 3 VVER V-320 PWR 950 21/12/1986
Khmelnitski 1 VVER V-320 PWR 950 31/12/1987
Khmelnitski 2 VVER V-320 PWR 950 07/08/2004
South Ukraine 1 VVER V-302 PWR 950 31/12/1982
South Ukraine 2 VVER V-338 PWR 950 06/01/1985
South Ukraine 3 VVER V-320 PWR 950 20/09/1989
Zaporizhzhia 1 VVER V-320 PWR 950 10/12/1984
Zaporizhzhia 2 VVER V-320 PWR 950 22/07/1985
Rivne 4 VVER V-320 PWR 950 10/10/2004
Zaporizhzhia 3 VVER V-320 PWR 950 10/12/1986
Zaporizhzhia 4 VVER V-320 PWR 950 18/12/1987
Nine Mile Point 1 BWR-2 (Mark 1) BWR 613 09/11/1969 99.70 5355.41
Dresden 2 BWR-3 (Mark 1) BWR 894 13/04/1970 102.40 8019.51
R.E. Ginna W (2-loop) PWR 560 02/12/1969 102.70 5038.60
Dresden 3 BWR-3 (Mark 1) BWR 879 22/07/1971 96.00 7389.46
Turkey Point 3 W (3-loop) DRYAMB PWR 837 02/11/1972 103.20 7570.46
Turkey Point 4 W (3-loop) DRYAMB PWR 821 21/06/1973 96.00 6908.00
Quad Cities 1 BWR-3 (Mark 1) BWR 908 12/04/1972 101.80 8095.80
Browns Ferry 1 BWR-4 (Mark 1) BWR 1200 15/10/1973 89.40 9396.07
Browns Ferry 2 BWR-4 (Mark 1) BWR 1200 28/08/1974 104.50 10981.47
H. B. Robinson 2 W (3-loop) DRYAMB PWR 741 26/09/1970 87.80 5695.94
Monticello BWR-3 BWR 628 05/03/1971 100.80 5545.27
Quad Cities 2 BWR-3 (Mark 1) BWR 911 23/05/1972 88.00 7026.45
Point Beach 1 W (2-loop) DRYAMB PWR 591 06/11/1970 92.60 4793.10
Oconee 1 B&W; (L-loop) PWR 847 06/05/1973 94.20 6988.17
Oconee 2 B&W; (L-loop) PWR 848 05/12/1973 95.90 7123.87
Salem 1 W (4-loop) DRYAMB PWR 1169 25/12/1976 89.00 9112.71
Diablo Canyon 1 W (4-loop) PWR 1138 11/11/1984 89.40 8912.10
Peach Bottom 2 BWR-4 (Mark 1) BWR 1300 18/02/1974 93.50 10652.64
Peach Bottom 3 BWR-4 (Mark 1) BWR 1331 01/09/1974 98.90 11531.32
Surry 1 W (3-loop) DRYSUB PWR 838 04/07/1972 87.10 6392.66
Surry 2 W (3-loop) DRYSUB PWR 838 10/03/1973 102.60 7533.78
Prairie Island 1 W (2-loop) DRYAMB PWR 522 04/12/1973 95.50 4368.70
Oconee 3 B&W; (L-loop) PWR 859 18/09/1974 93.20 7013.09
Browns Ferry 3 BWR-4 (Mark 1) BWR 1210 12/09/1976 84.40 8947.91
Cooper BWR-4 (Mark 1) BWR 769 10/05/1974 83.40 5618.50
Point Beach 2 W (2-loop) DRYAMB PWR 591 02/08/1972 102.40 5303.96
Prairie Island 2 W (2-loop) DRYAMB PWR 519 21/12/1974 105.20 4782.23
Salem 2 W (4-loop) DRYAMB PWR 1158 03/06/1981 100.00 10142.84
Arkansas Nuclear One 1 B&W; (L-loop) DRYAMB PWR 836 17/08/1974 75.80 5552.65
Donald C. Cook 1 W (4-loop) ICECDN PWR 1030 10/02/1975 83.60 7542.17
Donald C. Cook 2 W (4-loop) ICECND PWR 1168 22/03/1978 88.80 9082.20
Calvert Cliffs 1 CE (2-loop) DRYAMB PWR 877 03/01/1975 95.30 7319.64
Calvert Cliffs 2 CE (2-loop) DRYAMB PWR 855 07/12/1976 99.80 7472.48
Edwin I. Hatch 1 BWR-4 (Mark 1) BWR 876 11/11/1974 90.70 6962.11
Diablo Canyon 2 W (4-loop) PWR 1118 20/10/1985 89.30 8743.28
Brunswick 2 BWR-4 (Mark 1) BWR 932 29/04/1975 95.90 7831.71
Brunswick 1 BWR-4 (Mark 1) BWR 938 04/12/1976 92.00 7555.39
Sequoyah 1 W (4-loop) ICECND PWR 1152 22/07/1980 89.70 9049.98
Sequoyah 2 W (4-loop) (ICECND) PWR 1139 23/12/1981 98.00 9777.31
Fitzpatrick BWR-4 (Mark 1) BWR 813 01/02/1975 92.80 6612.74
Beaver Valley 1 W (3-loop) PWR 908 14/06/1976 84.70 6734.41
St. Lucie 1 COMB CE DRYAMB PWR 981 07/05/1976 91.10 7831.28
Millstone 2 COMB CE DRYAMB PWR 869 09/11/1975 98.20 7477.47
North Anna 1 W (3-loop) PWR 948 17/04/1978 90.10 7485.98
North Anna 2 W (3-loop) PWR 944 25/08/1980 82.00 6784.90
Enrico Fermi 2 BWR-4 (Mark 1) BWR 1115 21/09/1986 68.40 6681.70
Davis Besse 1 B&W; (R-loop) PWR 894 28/08/1977 82.80 6486.64
Joseph M. Farley 1 W (3-loop) PWR 874 18/08/1977 74.30 5688.30
Limerick 1 BWR-4 (Mark 2) BWR 1134 13/04/1985 91.80 9117.79
Limerick 2 BWR-4 (Mark 2) BWR 1134 01/09/1989 101.20 10049.36
Hope Creek 1 BWR-4 (Mark 1) BWR 1172 01/08/1986 89.90 9229.60
Joseph M. Farley 2 W (3-loop) DRYAMB PWR 883 25/05/1981 94.60 7316.70
Edwin I. Hatch 2 BWR-4 (Mark 1) BWR 883 22/09/1978 97.70 7557.77
Arkansas Nuclear One 2 CE (2-loop) DRYAMB PWR 988 26/12/1978 101.30 8767.06
McGuire 1 W (4-loop) ICECND PWR 1158 12/09/1981 91.20 9252.30
McGuire 2 W (4-loop) (ICECND) PWR 1158 23/05/1983 101.10 10252.47
Lasalle 1 BWR-5 (Mark 2) BWR 1137 04/09/1982 93.10 9275.00
Lasalle 2 BWR-5 (Mark 2) BWR 1140 20/04/1984 99.60 9941.96
Waterford 3 CE (2-loop) PWR 1168 18/03/1985 76.80 7863.02
Susquehanna Steam Electric Station 1 BWR-4 (Mark 2) BWR 1257 16/11/1982 85.60 9428.21
Susquehanna Steam Electric Station 2 BWR-4 (Mark 2) BWR 1257 03/07/1984 96.60 10634.60
St. Lucie 2 COMB CE DRYAMB PWR 987 13/06/1983 97.80 8458.50
Watts Bar 1 W (4-loop) (ICECND) PWR 1157 06/02/1996 98.50 9979.10
Watts Bar 2 W (4-loop) (ICECND) PWR 1164 03/06/2016 66.90 6824.42
Virgil C. Summer 1 W (3-loop) DRYAMB PWR 973 16/11/1982 100.80 8591.09
Columbia BWR-5 (Mark 2) BWR 1131 27/05/1984 99.40 9851.54
Harris 1 W (3-loop) DRYAMB PWR 964 19/01/1987 92.40 7806.87
Nine Mile Point 2 BWR-5 (Mark 2) BWR 1277 08/08/1987 87.60 9804.76
Beaver Valley 2 W (3-loop) PWR 905 17/08/1987 101.10 8015.62
Catawba 1 W (4-loop) (ICECND) PWR 1160 22/01/1985 101.10 10277.60
Catawba 2 W (4-loop) (ICECND) PWR 1150 18/05/1986 86.20 8685.27
Grand Gulf 1 BWR-6 (Mark 3) BWR 1401 20/10/1984 71.40 8761.20
Millstone 3 W (4-loop) DRYSUB PWR 1210 12/02/1986 85.40 9046.54
Vogtle 1 W (4-loop) DRYAMB PWR 1150 27/03/1987 100.70 10141.46
Vogtle 2 W (4-loop) DRYAMB PWR 1152 10/04/1989 92.90 9373.75
Perry 1 BWR-6 (Mark 3) BWR 1240 19/12/1986 95.10 10334.45
Seabrook 1 W (4-loop) DRYAMB PWR 1246 29/05/1990 100.10 10921.11
Comanche Peak 1 W (4-loop) DRYAMB PWR 1205 24/04/1990 88.70 9363.00
Comanche Peak 2 W (4-loop) DRYAMB PWR 1195 09/04/1993 99.90 10462.06
Byron 1 W (4-loop) (DRYAMB) PWR 1164 01/03/1985 102.20 10425.57
Byron 2 W (4-Loop) (DRYAMB) PWR 1136 06/02/1987 93.60 9316.18
Braidwood 1 W (4-loop) PWR 1194 12/07/1987 94.60 9898.29
Braidwood 2 W (4-loop) DRYAMB PWR 1160 25/05/1988 100.90 10257.34
River Bend 1 BWR-6 (Mark 3) BWR 967 03/12/1985 98.20 8321.81
Clinton 1 BWR-6 (Mark 3) BWR 1062 24/04/1987 99.20 9224.08
Wolf Creek W (4-loop) PWR 1200 12/06/1985 85.40 8981.96
Callaway 1 W (4-loop) DRYAMB PWR 1215 24/10/1984 83.40 8882.15
South Texas Project 1 W (4-loop) PWR 1280 30/03/1988 103.40 11593.44
South Texas Project 2 W (4-loop) DRYAMB PWR 1280 11/04/1989 92.40 10360.23
Palo Verde 1 CE (2-loop) DRYAMB PWR 1311 10/06/1985 90.70 10418.48
Palo Verde 2 COMB CE80 DRYAMB PWR 1314 20/05/1986 97.20 11192.86
Palo Verde 3 COMB CE80 DRYAMB PWR 1312 28/11/1987 89.80 10321.36
Koeberg 1 CP1 PWR 924 04/04/1984 90.00 7280.79
Koeberg 2 CP1 PWR 930 25/07/1985 34.90 2842.90
Tianwan 1 VVER V-428 PWR 1000 12/05/2006 93.20 8167.00
Tianwan 2 VVER V-428 PWR 1000 14/05/2007 84.70 7420.49
Qinshan 3 2 CANDU 6 PHWR 677 12/06/2003 84.00 4979.49
Higashi Dori 1 (Tohoku) BWR-5 BWR 1067 09/03/2005
Shika 2 ABWR BWR 1108 04/07/2005
Hamaoka 5 ABWR BWR 1325 30/04/2004
Kudankulam 1 VVER V-412 PWR 932 22/10/2013 80.50 6572.07
Kudankulam 2 VVER V-412 PWR 932 29/08/2016 80.70 6586.51
Tomari 3 M (3-loop) PWR 866 20/03/2009
Olkiluoto 3 EPR PWR 1575 12/03/2022 1886.77
Shin Kori 1 OPR-1000 PWR 996 04/08/2010 85.60 7467.99
Shin Kori 2 OPR-1000 PWR 996 28/01/2012 86.20 7518.95
Ling Ao 4 CPR-1000 PWR 1007 03/05/2011 100.20 8841.24
Qinshan 2 3 CNP-600 PWR 623 01/08/2010 100.80 5468.09
Qinshan 2 4 CNP-600 PWR 623 25/11/2011 88.70 4812.10
Ling Ao 3 CPR-1000 PWR 1007 15/07/2010 85.70 7556.80
Sanmen 1 AP1000 PWR 1157 30/06/2018 86.90 8805.20
Sanmen 2 AP1000 PWR 1157 24/08/2018 91.30 9254.09
Yangjiang 1 CPR-1000 PWR 1000 31/12/2013 95.60 8373.86
Yangjiang 2 CPR-1000 PWR 1000 10/03/2015 93.10 8156.58
Shin Wolsong 1 OPR-1000 PWR 997 27/01/2012 90.40 7892.31
Shin Wolsong 2 OPR-1000 PWR 993 26/02/2015 83.90 7296.90
Saeul 1 APR-1400 PWR 1416 15/01/2016 99.40 12328.84
Saeul 2 APR-1400 PWR 1418 22/04/2019 80.10 9954.85
Shin Hanul 1 APR-1400 PWR 1414 09/06/2022 100.10 3090.99
Shin Hanul 2 APR-1400 PWR 1340 21/12/2023
Akademik Lomonosov 1 KLT-40S 'Floating' PWR 32 19/12/2019 26.40 74.13
Akademik Lomonosov 2 KLT-40S 'Floating' PWR 32 19/12/2019 30.50 85.48
Novovoronezh 2 1 VVER V-392M PWR 1100 05/08/2016 78.40 7558.04
Novovoronezh 2 2 VVER V-392M PWR 1101 01/05/2019 81.60 7875.32
Leningrad 2 1 VVER V-491 PWR 1101 09/03/2018 80.00 7714.52
Leningrad 2 2 VVER V-491 PWR 1101 22/10/2020 77.90 7510.31
Hongyanhe 1 CPR-1000 PWR 1061 17/02/2013 81.80 7605.00
Hongyanhe 2 CPR-1000 PWR 1061 23/11/2013 95.60 8882.06
Hongyanhe 3 CPR-1000 PWR 1061 23/03/2015 77.40 7198.11
Hongyanhe 4 CPR-1000 PWR 1061 01/04/2016 86.10 8000.10
Haiyang 1 AP1000 PWR 1170 17/08/2018 92.90 9520.82
Haiyang 2 AP1000 PWR 1170 13/10/2018 95.40 9773.92
Fangjiashan 1 CPR-1000 PWR 1012 04/11/2014 92.60 8212.68
Fangjiashan 2 CPR-1000 PWR 1012 12/01/2015 93.60 8301.13
Fuqing 1 CPR-1000 PWR 1000 20/08/2014 90.50 7927.14
Fuqing 2 CPR-1000 PWR 1000 06/08/2015 93.50 8194.52
Taishan 1 EPR-1750 PWR 1660 29/06/2018 28.30 4113.09
Taishan 2 EPR-1750 PWR 1660 23/06/2019 57.10 8297.85
Ningde 1 CPR-1000 PWR 1018 28/12/2012 100.00 8917.03
Ningde 2 CPR-1000 PWR 1018 04/01/2014 93.10 8303.72
Ningde 3 CPR-1000 PWR 1018 21/03/2015 92.40 8239.00
Ningde 4 CPR-1000 PWR 1018 29/03/2016 91.10 8126.58
Yangjiang 3 CPR-1000 PWR 1000 18/10/2015 102.60 8991.99
Yangjiang 4 CPR-1000 PWR 1000 08/01/2017 89.30 7820.95
Yangjiang 5 ACPR-1000 PWR 1000 23/05/2018 94.00 8236.09
Yangjiang 6 ACPR-1000 PWR 1000 29/06/2019 95.30 8349.54
Fuqing 3 CPR-1000 PWR 1000 07/09/2016 91.40 8011.27
Fuqing 4 CPR-1000 PWR 1000 29/07/2017 89.00 7799.96
Fuqing 5 Hualong One PWR 1075 27/11/2020 71.40 6721.77
Fuqing 6 HPR1000 PWR 1075 01/01/2022 91.70 8810.67
Changjiang 1 CNP-600 PWR 601 07/11/2015 98.70 5195.39
Changjiang 2 CNP-600 PWR 601 20/06/2016 87.10 4587.19
Fangchenggang 1 CPR-1000 PWR 1000 25/10/2015 96.10 8414.60
Fangchenggang 2 CPR-1000 PWR 1000 15/07/2016 93.20 8168.69
Fangchenggang 3 HPR1000 PWR 1105 10/01/2023
Fangchenggang 4 HPR1000 PWR 1105 09/04/2024
Shidao Bay 1 HTR-PM HTGR 150 20/12/2021
Tianwan 3 VVER V-428M PWR 1060 30/12/2017 94.30 8757.42
Tianwan 4 VVER V-428M PWR 1060 27/10/2018 89.10 8273.71
Tianwan 5 ACPR-1000 PWR 1060 08/08/2020 96.20 8933.22
Tianwan 6 ACPR-1000 PWR 1060 11/05/2021 81.20 7538.05
Kakrapar 3 PHWR-700 PHWR 630 10/01/2021 0.76
Kakrapar 4 PHWR-700 PHWR 630 20/02/2024
Hongyanhe 5 ACPR-1000 PWR 1061 25/06/2021 66.90 6217.30
Hongyanhe 6 ACPR-1000 PWR 1061 02/05/2022 81.80 5000.45
Vogtle 3 AP1000 PWR 1117 01/04/2023
Vogtle 4 AP1000 PWR 1117 01/03/2024
Chashma Nuclear Power Plant 3 CNP-300 PWR 315 15/10/2016 88.00 2426.79
Chashma Nuclear Power Plant 4 CNP-300 PWR 313 25/06/2017 96.80 2654.75
Barakah 1 APR-1400 PWR 1337 19/08/2020 70.00 8196.79
Barakah 2 APR-1400 PWR 1337 14/09/2021 9914.13
Barakah 3 APR-1400 PWR 1337 08/10/2022 1189.53
Barakah 4 APR-1400 PWR 1337 23/03/2024
Ostrovets 1 VVER V-491 PWR 1110 03/11/2020 45.40 4411.35
Ostrovets 2 VVER V-491 PWR 1110 13/05/2023
Karachi 2 HPR1000 PWR 1017 18/03/2021 70.00 6240.36
Karachi 3 HPR1000 PWR 1017 04/03/2022 90.00 6181.90

All Under Construction Reactors

Reactor Name Model Process Capacity (MWe) Construction Start
Angra 3 PRE KONVOI PWR 1340 30/05/2010
El Dabaa 1 VVER-1200/V-529 PWR 1100 20/07/2022
El Dabaa 2 VVER-1200/V-529 PWR 1100 20/11/2022
Rajasthan 7 Horizontal Pressure Tube type PHWR 630 18/07/2011
Rajasthan 8 Horizontal Pressure Tube type PHWR 630 30/09/2011
Bushehr 2 VVER-1000 PWR 974 10/11/2019
Mochovce 4 VVER V-213 PWR 440 27/01/1987
Akkuyu 1 VVER V-509 PWR 1114 03/04/2018
Khmelnitski 3 VVER V-392B PWR 1035 01/03/1986
Khmelnitski 4 VVER V-392B PWR 1035 01/02/1987
PFBR Prototype FBR 470 23/10/2004
Shimane 3 ABWR BWR 1325 24/10/2006
Ohma ABWR BWR 1328 07/05/2010
Flamanville 3 EPR PWR 1630 03/12/2007
Kursk 2 1 VVER V-510 PWR 1200 28/04/2018
Changjiang-3 Hualong One PWR 1100 31/03/2021
Changjiang-4 Hualong One PWR 1100 28/12/2021
Haiyang 3 CAP1000 PWR 1161 07/07/2022
Haiyang 4 CAP1000 PWR 1161 22/04/2023
Sanmen 3 CAP1000 PWR 1163 28/06/2022
Sanmen 4 CAP1000 PWR 1163 22/03/2023
Xudabao 1 CAP1000 PWR 1000 03/11/2023
Kursk 2-2 VVER-TOI PWR 1101 15/04/2019
Carem25 CAREM Prototype (Integrated-PWR) PWR 25 08/02/2014
Kudankulam 3 VVER V-412 PWR 917 29/06/2017
Kudankulam 4 VVER V-412 PWR 917 23/10/2017
Hinkley Point C 1 EPR-1750 PWR 1630 11/12/2018
Hinkley Point C 2 EPR-1750 PWR 1630 12/12/2019
Saeul 3 APR-1400 PWR 1340 01/04/2017
Saeul 4 APR-1400 PWR 1340 20/09/2018
Rooppur 1 VVER V-523 PWR 1080 30/11/2017
Rooppur 2 VVER V-523 PWR 1080 14/07/2018
Akkuyu 2 VVER V-509 PWR 1114 08/04/2020
Akkuyu 3 VVER V-509 PWR 1114 10/03/2021
Akkuyu 4 VVER V-509 PWR 1114 21/07/2022
Zhangzhou 1 Hualong One PWR 1126 16/10/2019
Taipingling 1 HPR1000 PWR 1116 26/12/2019
Zhangzhou 2 Hualong One PWR 1126 04/09/2020
Taipingling 2 HPR1000 PWR 1116 15/10/2020
San'ao 1 Hualong One PWR 1117 31/12/2020
Xiapu 1 CFR-600 FBR 600 29/12/2017
Xudabao 3 VVER V-491 PWR 1200 28/07/2021
Tianwan 7 VVER V-491 PWR 1100 19/05/2021
San'ao 2 Hualong One PWR 1117 31/12/2021
Kudankulam 5 VVER V-412 PWR 917 29/06/2021
Kudankulam 6 VVER V-412 PWR 917 20/12/2021
Tianwan 8 VVER V-491 PWR 1100 25/02/2022
Xudabao 4 VVER V-491 PWR 1200 19/05/2022
Lufeng 5 Hualong One PWR 1116 08/09/2022
Lufeng 6 Hualong One PWR 1116 26/08/2023
El Dabaa 3 VVER-1200/V-529 PWR 1100 03/05/2023
Changjiang SMR-1 ACP100 PWR 125 13/07/2021
El Dabaa 4 VVER-1200/V-529 PWR 1100 23/01/2024
Leningrad 2-3 VVER V-491 PWR 1101 14/03/2024
Lianjiang 2 CAP1000 PWR 1161 26/04/2024
Lianjiang 1 CAP1000 PWR 1161 27/09/2023
Seversk BREST-OD-300 BREST-OD-300 FBR 300 08/06/2021
Shidaowan 1 CAP1400 PWR 1400 19/06/2019
Shidaowan 2 CAP1400 PWR 1400 21/04/2020
Xiapu 2 CFR-600 FBR 600 27/12/2020
Zhangzhou 3 Hualong One PWR 1126 22/02/2024

All Under Construction Reactors

Reactor Name Model Process Capacity (MWe) Permanent Shutdown
Armenian 1 VVER V-270 PWR 376 25/02/1989
BR-3 Prototype PWR 10 30/06/1987
Doel 3 W (3-loop) PWR 1006 23/09/2022
Tihange 2 W (3-loop) PWR 1008 31/01/2023
Kozloduy 1 VVER V-230 PWR 408 31/12/2002
Kozloduy 2 VVER V-230 PWR 408 31/12/2002
Kozloduy 3 VVER V-230 PWR 408 31/12/2006
Kozloduy 4 VVER V-230 PWR 408 31/12/2006
Rolphton NPD CANDU PHWR 22 01/08/1987
Gentilly 2 CANDU 6 PHWR 635 28/12/2012
Douglas Point CANDU 200 PHWR 206 04/05/1984
Gentilly 1 HW BLWR 250 HWLWR 250 01/06/1977
Pickering 2 CANDU 500A PHWR 515 28/05/2007
Pickering 3 CANDU 500A PHWR 515 31/10/2008
Muehleberg BWR-4 BWR 373 20/12/2019
VAK Kahl BWR BWR 15 25/11/1985
Stade PWR 640 14/11/2003
Niederaichbach pressure tube reactor HWGCR 100 31/07/1974
Biblis A PWR PWR 1167 06/08/2011
Brunsbuettel BWR-69 BWR 771 06/08/2011
Philippsburg 1 BWR-69 BWR 890 06/08/2011
Neckarwestheim 1 PWR PWR 785 06/08/2011
Isar 1 BWR-69 BWR 878 06/08/2011
Unterweser PWR PWR 1345 06/08/2011
Biblis B PWR PWR 1240 06/08/2011
THTR-300 Pebble bed reactor HTGR 296 29/09/1988
Mzfr - PHWR 52 03/05/1984
Kruemmel BWR-69 BWR 1346 06/08/2011
Muelheim Kaerlich PWR PWR 1219 09/09/1988
Grafenrheinfeld PWR PWR 1275 27/06/2015
Philippsburg 2 PWR PWR 1402 31/12/2019
Gundremmingen B BWR-72 BWR 1284 31/12/2017
Grohnde PWR PWR 1360 31/12/2021
Gundremmingen C BWR-72 BWR 1288 31/12/2021
Gundremmingen A BWR 237 13/01/1977
Isar 2 Konvoi PWR 1410 15/04/2023
Brokdorf PWR PWR 1410 31/12/2021
Emsland Konvoi PWR 1335 15/04/2023
AVR Juelich Pebble bed reactor prototype HTGR 13 31/12/1988
Neckarwestheim 2 Konvoi PWR 1310 15/04/2023
Obrigheim PWR 340 11/05/2005
Rheinsberg VVER-70 PWR 62 01/06/1990
Greifswald 1 VVER V-230 PWR 408 14/02/1990
Greifswald 2 VVER V-230 PWR 408 14/02/1990
Greifswald 3 VVER V-230 PWR 408 28/02/1990
Greifswald 4 VVER V-230 PWR 408 22/07/1990
Greifswald 5 VVER V-213 PWR 408 24/11/1989
Lingen BWR with fossil fuel-fired superheater BWR 183 05/01/1977
HDR Grosswelzheim Superheated steam reactor BWR 25 20/04/1971
KNK II Prototype FBR 17 23/08/1991
Wuergassen BWR 640 26/08/1994
Jose Cabrera 1 W (1-loop) PWR 141 30/04/2006
Santa Maria De Garona BWR-3 BWR 446 02/08/2017
Vandellos 1 GCR 480 31/07/1990
G 3 (Marcoule) GCR 40 20/06/1984
Phenix PH-250 FBR 130 01/02/2010
Fessenheim 1 CP0 PWR 880 22/02/2020
Fessenheim 2 CP0 PWR 880 29/06/2020
G 2 (Marcoule) GCR 39 02/02/1980
Chinon A 1 UNGG GCR 70 16/04/1973
Super Phenix Na-1200 FBR 1200 31/12/1998
Chinon A 2 UNGG GCR 180 14/06/1985
Chinon A 3 UNGG GCR 360 15/06/1990
Chooz A (Ardennes) CHOOZ-A PWR 305 30/10/1991
El 4 (Monts D'Arree) MONTS-D'ARREE HWGCR 70 31/07/1985
St. Laurent A 1 UNGG GCR 390 18/04/1990
St. Laurent A 2 UNGG GCR 465 27/05/1992
Bugey 1 UNGG GCR 540 27/05/1994
Calder Hall 1 MAGNOX GCR 49 31/03/2003
Calder Hall 2 MAGNOX GCR 49 31/03/2003
Calder Hall 3 MAGNOX GCR 49 31/03/2003
Calder Hall 4 MAGNOX GCR 49 31/03/2003
Sizewell A 1 MAGNOX GCR 210 31/12/2006
Sizewell A 2 MAGNOX GCR 210 31/12/2006
Oldbury A 1 MAGNOX GCR 217 29/02/2012
Oldbury A 2 MAGNOX GCR 217 30/06/2011
Winfrith SGHWR SGHWR 92 11/09/1990
Wylfa 1 MAGNOX GCR 490 30/12/2015
Wylfa 2 MAGNOX GCR 490 25/04/2012
Dounreay DFR FBR 11 01/03/1977
Dounreay PFR FBR 234 31/03/1994
Hinkley Point B 1 AGR GCR 485 01/08/2022
Hinkley Point B 2 AGR GCR 480 06/07/2022
Hunterston B 1 AGR GCR 490 26/11/2021
Hunterston B 2 AGR GCR 495 07/01/2022
Dungeness B 1 AGR GCR 545 07/06/2021
Dungeness B 2 AGR GCR 545 07/06/2021
Chapelcross 1 MAGNOX GCR 48 29/06/2004
Chapelcross 2 MAGNOX GCR 48 29/06/2004
Chapelcross 3 MAGNOX GCR 48 29/06/2004
Chapelcross 4 MAGNOX GCR 48 29/06/2004
Berkeley 1 MAGNOX GCR 138 31/03/1989
Berkeley 2 MAGNOX GCR 138 26/10/1988
Bradwell 1 MAGNOX GCR 123 31/03/2002
Bradwell 2 MAGNOX GCR 123 30/03/2002
Windscale AGR AGR GCR 24 03/04/1981
Hunterston A 1 MAGNOX GCR 150 30/03/1990
Hunterston A 2 MAGNOX GCR 150 31/12/1989
Hinkley Point A 1 MAGNOX GCR 235 23/05/2000
Hinkley Point A 2 MAGNOX GCR 235 23/05/2000
Trawsfynydd 1 MAGNOX GCR 195 06/02/1991
Trawsfynydd 2 MAGNOX GCR 195 04/02/1991
Dungeness A 1 MAGNOX GCR 225 31/12/2006
Dungeness A 2 MAGNOX GCR 225 31/12/2006
Rajasthan 1 Horizontal Pressure Tube type PHWR 90
Latina MAGNOX GCR 153 01/12/1987
Garigliano BWR-1 BWR 150 01/03/1982
Enrico Fermi W (4-loop) PWR 260 01/07/1990
Caorso BWR-4 (Mark 2) BWR 860 01/07/1990
Japan Power Demonstration Reactor (JPDR) BWR-1 BWR 12 18/03/1976
Fukushima Daiichi 3 BWR-4 BWR 760 19/05/2011
Hamaoka 1 BWR-4 BWR 516 30/01/2009
Genkai 1 M (2-loop) PWR 529 27/04/2015
Ohi 1 W (4-loop) PWR 1120 01/03/2018
Fukushima Daiichi 4 BWR-4 BWR 760 19/05/2011
Fukushima Daiichi 5 BWR-4 BWR 760 17/12/2013
Fukushima Daiichi 6 BWR-5 BWR 1067 17/12/2013
Ohi 2 W (4-loop) PWR 1120 01/03/2018
Tokai 1 MAGNOX GCR 137 31/03/1998
Fugen ATR ATR HWLWR 148 29/03/2003
Onagawa 1 BWR-4 BWR 498 21/12/2018
Ikata 1 M (2-loop) PWR 538 10/05/2016
Hamaoka 2 BWR-4 BWR 814 30/01/2009
Fukushima Daini 1 BWR-5 BWR 1067 30/09/2019
Fukushima Daini 2 BWR-5 BWR 1067 30/09/2019
Genkai 2 M (2-loop) PWR 529 09/04/2019
Tsuruga 1 BWR-2 BWR 340 27/04/2015
Monju - FBR 246 05/12/2017
Ikata 2 M (2-loop) PWR 538 23/05/2018
Fukushima Daini 3 BWR-5 BWR 1067 30/09/2019
Fukushima Daini 4 BWR-5 BWR 1067 30/09/2019
Mihama 1 W (2-loop) PWR 320 27/04/2015
Fukushima Daiichi 1 BWR-3 BWR 439 19/05/2011
Mihama 2 M (2-loop) PWR 470 27/04/2015
Shimane 1 BWR-3 BWR 439 30/04/2015
Fukushima Daiichi 2 BWR-4 BWR 760 19/05/2011
Kori 1 WH 60 PWR 576 19/06/2017
Wolsong 1 CANDU 6 PHWR 661 24/12/2019
Aktau BN-350 FBR 52 22/04/1999
Ignalina 1 RBMK-1500 LWGR 1185 31/12/2004
Ignalina 2 RBMK-1500 LWGR 1185 31/12/2009
Dodewaard GE design BWR 55 26/03/1997
Karachi 1 CANDU-137 MW PHWR 90 01/08/2021
APS 1 Obninsk AM-1 LWGR 5 29/04/2002
Bilibino 1 EGP-6 LWGR 11 14/01/2019
Leningrad 1 RBMK-1000 LWGR 925 22/12/2018
Leningrad 2 RBMK-1000 LWGR 925 10/11/2020
Kursk 1 RBMK-1000 LWGR 925 19/12/2021
Kursk 2 RBMK-1000 LWGR 925 31/01/2024
Beloyarsk 1 AMB-100 LWGR 102 01/01/1983
Novovoronezh 1 VVER V-120 PWR 197 16/02/1988
Beloyarsk 2 AMB-200 LWGR 146 01/01/1990
Novovoronezh 2 VVER V-120 PWR 336 29/08/1990
Novovoronezh 3 VVER V-179 PWR 385 25/12/2016
Agesta R3/Adam PHWR 10 02/06/1974
Oskarshamn 1 ABB-I BWR 473 19/06/2017
Oskarshamn 2 ABB-II BWR 638 22/12/2016
Ringhals 1 ABB-I BWR 881 30/12/2020
Ringhals 2 W (3-loops) PWR 852 31/12/2019
Barseback 1 ABB-II BWR 600 30/11/1999
Barseback 2 ABB-II BWR 600 31/05/2005
Bohunice A1 KS 150 HWGCR 93 22/02/1977
Bohunice 1 VVER V-230 PWR 408 31/12/2006
Bohunice 2 VVER V-230 PWR 408 31/12/2008
Chinshan 1 BWR-4 BWR 604 06/12/2018
Chinshan 2 BWR-4 BWR 604 16/07/2019
Kuosheng 1 BWR-6 BWR 985 01/07/2021
Kuosheng 2 BWR-6 BWR 985 15/03/2023
Chernobyl 1 RBMK LWGR 740 30/11/1996
Chernobyl 2 RBMK LWGR 925 11/10/1991
Chernobyl 3 RBMK LWGR 925 15/12/2000
Chernobyl 4 RBMK LWGR 925 26/04/1986
Elk River - BWR 22 01/02/1968
Dresden 1 BWR 197 31/10/1978
Pathfinder Prototype BWR 59 01/10/1967
Humboldt Bay Natural cir. BWR 63 02/07/1976
Carolinas Virginia Tube Reactor (CVTR) Prototype PHWR 17 10/01/1967
Big Rock Point - BWR 67 29/08/1997
Enrico Fermi 1 Liquid Metal FBR FBR 61 29/11/1972
Peach Bottom 1 HTGR 40 01/11/1974
San Onofre 1 PWR PWR 436 30/11/1992
Haddam Neck - PWR 560 05/12/1996
Oyster Creek BWR-2 (Mark 1) BWR 619 17/09/2018
Millstone 1 BWR 641 01/07/1998
Indian Point 2 W (4-loop) DRYAMB PWR 998 30/04/2020
Palisades CE (2-loop) DRYAMB PWR 805 20/05/2022
Fort St. Vrain HTGR 330 29/08/1989
Vermont Yankee BWR-4 (Mark 1) BWR 605 29/12/2014
Fort Calhoun 1 CE (2-loop) PWR 482 24/10/2016
Indian Point 3 W (4-loop) DRYAMB PWR 1030 01/05/2021
Three Mile Island 1 B&W; (L-loop) PWR 819 20/09/2019
Yankee NPS PWR PWR 167 01/10/1991
Pilgrim 1 BWR-3 (Mark 1) BWR 677 31/05/2019
Zion 1 W (4-loop) PWR 1040 13/02/1998
Indian Point 1 PWR PWR 257 31/10/1974
Crystal River 3 B&W; (L-loop) PWR 860 05/02/2013
Zion 2 W (4-loop) PWR 1040 13/02/1998
Kewaunee W (2-loop) DRYAMB PWR 566 07/05/2013
Maine Yankee PWR 860 01/08/1997
Rancho Seco 1 PWR PWR 873 07/06/1989
Three Mile Island 2 PWR PWR 880 28/03/1979
Shoreham - BWR 820 01/05/1989
Duane Arnold 1 BWR-4 (Mark 1) BWR 601 30/10/2020
Trojan PWR 1095 09/11/1992
San Onofre 2 CE (2-loop) DRYAMB PWR 1070 07/06/2013
San Onofre 3 CE (2-loop) DRYAMB PWR 1080 07/06/2013
Bonus Superheater BWR 17 01/06/1968
Lacrosse BWR 48 30/04/1987
Shippingport PLWBR PWR 60 01/10/1982
Hallam LMGMR (SGR- Sodium cooled graphite moderated reactor) X 75 01/09/1964
Saxton 25 PWR 3 01/05/1972
Vallecitos 25 BWR 24 09/12/1963
Piqua OCM (Organically Cooled and Moderated Reactor) X 12 01/01/1966
Lucens HWGCR: 2-loops HWGCR 6 21/01/1969

Data Sources: World Nuclear Association and IAEA Power Reactor Information System